Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
117 RUSTIC LODGE W, Minneapolis
replace entry door
121 RUSTIC LODGE W, Minneapolis
dryer
104 RUSTIC LODGE E, Minneapolis
CRAWL SPACE ENCAPSULATION WITH FOAMAX, PROVIDE THERMAL BARRIER FOR SEPARATION SFD (MAA) GENERAL COMMENTS: APPLICANT MUST LOCATE AND IDENTIFY THE PROPERTY STAKES AND CALL FOR INSPECTION FOR BUILDING INSPECTOR VERIFICATION BEFORE CONCRETE IS POURED. AP
132 RUSTIC LODGE W, Minneapolis
Basement bath and laundry remodel.
132 RUSTIC LODGE W, Minneapolis
SFD BASEMENT BATHROOM REMODEL - INSTALL PARTITION FRAMING TO EXPAND EXISTING BATHROOM TO APPROX. 8'x3' TO INSTALL SINK AND FRAMING IN EXISTING LAUNDRY ROOM TO ENCLOSE NEW CT WALK-IN SHOWER. 2x4 FRAMING, 1/2" GYP BD FINISHES. (LAH) Building Code: 2015 M
128 RUSTIC LODGE W, Minneapolis
Drain Tile
24 RUSTIC LODGE E, Minneapolis
Move laundry sink appox 5 feet, install new gas line to range
107 RUSTIC LODGE E, Minneapolis
Re-roof, Gutters, Fascia, Window Wraps
131 RUSTIC LODGE W, Minneapolis
relocate 1 supply and install 1 bath fan
104 RUSTIC LODGE E, Minneapolis
REPLACE ENTRY DOOR
17 RUSTIC LODGE E, Minneapolis
CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. (sza) MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOWED AND 10" MINIMUM TREAD DEPTH REQUIRED. THE
131 RUSTIC LODGE W, Minneapolis
Master bathroom renovation to include relocating main stack, water pipe and connect plumbing fixtures at final.
24 RUSTIC LODGE E, Minneapolis
basement finish including bedroom, egress window, laundry area and living room. sck#2 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT.
131 RUSTIC LODGE W, Minneapolis
Bathroom Remodel & Master Bedroom Closet SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 IRC 313.2.1. When interior alteration
108 RUSTIC LODGE E, Minneapolis
Provide gas piping from gas meter to furnace, water heater, dryer and stove
108 RUSTIC LODGE E, Minneapolis
Whole house remodel adding return and supplies bath vents, kitchen vent, dryer vent
108 RUSTIC LODGE E, Minneapolis
16 fixtures plus garbage disposal
24 RUSTIC LODGE E, Minneapolis
Drain Tile
132 RUSTIC LODGE W, Minneapolis
Replace Fan Coil
108 RUSTIC LODGE E, Minneapolis
COMPLETE INTERIOR REMODEL. GUTTING 1ST AND SECOND FLOOR. NO BASEMENT WORK. NEW WINDOWS. 47 WINDOW INSERTS. REMOVING SOME LOAD BEARING WALLS. REPLACING WITH LVLS. LVLS TO BE SUPPORTED BY COLUMNS WHICH SHOULD BEAR ON FOUNDATION WALLS BELOW. 1ST FLOO
215 RUSTIC LODGE W, Minneapolis
Replace current 40 gallon water heater with new 40 gallon water heater.
221 RUSTIC LODGE W, Minneapolis
drain tile
9 RUSTIC LODGE E, Minneapolis
TEAR OFF AND RE-ROOF
108 RUSTIC LODGE E, Minneapolis
R&R roof house and detached garage
200 RUSTIC LODGE W, Minneapolis
Residential tear off and re-roof house only
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.