Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
103 RUSTIC LODGE W, Minneapolis
Administrative no fee permit issued to homeowner to take over all work originally permitted under BLDG1020014. Original description of work below - no change to scope of previously permitted work. (DMH - ProjectDox) REMODEL BATHROOM IN SFD. CHANGE
16 RUSTIC LODGE W, Minneapolis
INSTALL GAS STOVE TOP
229 RUSTIC LODGE W, Minneapolis
(DMH-ProjectDox) CONSTRUCT 12' X10' SINGLE LEVEL REAR ADDITION TO SFD FOR KITCHEN REMODEL/EXPANSION OVER "NUDURA" ICF FROST FOUNDATION. INSTALL NEW 12' X 6'-9" FRONT CONCRETE LANDING & STEPS OVER NEW FOUNDATION. INSTALL NEW LVL BEAMS PER PLAN . I
101 RUSTIC LODGE E, Minneapolis
Re roof - remove down to plywood. Replace any plywood. Add all new roofing components.
206 RUSTIC LODGE W, Minneapolis
reroof
229 RUSTIC LODGE W, Minneapolis
GAS FIREPLACE INSTALLATION WITH GAS LINE AND VENTING
103 RUSTIC LODGE W, Minneapolis
Install one new shower 1 toilet and 1 lav
103 RUSTIC LODGE W, Minneapolis
(DMH - ProjectDox) REMODEL BATHROOM IN SFD. CHANGE TUB LOCATION INTO WALK-IN SHOWER STALL. REPLACE BATHROOM FIXTURES WITH NEW IN SAME LOCATION. REPLACE WINDOW WITH TEMPERED. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. WATER-RE
229 RUSTIC LODGE W, Minneapolis
METER MOVE Q2 - 2023 BATCH #10
18 RUSTIC LODGE W, Minneapolis
water heater
18 RUSTIC LODGE W, Minneapolis
We will be adding duct work to the new basement design. There has been an abatement already. We will be adding supply and return ducts to the basement and reconnecting the second floor. we will be insulating the dryer venting to code
18 RUSTIC LODGE W, Minneapolis
add basement full bath, bar and laundry
118 RUSTIC LODGE W, Minneapolis
replace gas dryer
108 RUSTIC LODGE E, Minneapolis
Replace Gas Dryer
18 RUSTIC LODGE W, Minneapolis
INSTALL WALL FINISHES IN BASEMENT (NO NEW BEDROOMS CREATED BY THIS PERMIT) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENT
19 RUSTIC LODGE W, Minneapolis
2nd floor bathroom
19 RUSTIC LODGE W, Minneapolis
2ND FLOOR BATHROOM REMODEL OF EXISTING S INGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). - GUT EXISTING BATHROOM TO STUDS TO ALLOW FOR NEW RENOVATION WORK TO BE DONE. - INSULATE WALLS AS NOTE DON FLOOR PLAN USING SPRAY FOAM INSULATION. *** SEE ATTACHE
19 RUSTIC LODGE W, Minneapolis
Vent bath fan and install cast iron base
8 RUSTIC LODGE E, Minneapolis
reroof 16 squares
104 RUSTIC LODGE E, Minneapolis
GAS PIPING TO EXISTING FIXTURES: FURNACE, WATER HEATER, RANGE, DRYER
104 RUSTIC LODGE E, Minneapolis
GAS PIPING TO FURNACE, WATER HEATER, RANGE, DRYER
22 RUSTIC LODGE W, Minneapolis
TEAR OFF AND REROOF HOUSE
127 RUSTIC LODGE W, Minneapolis
REPLACE BOILER
229 RUSTIC LODGE W, Minneapolis
move gas meter and run new main gas lines to water heater, stove and boiler
229 RUSTIC LODGE W, Minneapolis
install Mitsubishi Ductless minisplit on 1st and 2nd floors; add 5 supply and 4 return airs on each floor
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.