Alterations bid pack #2 - finishing areas A, B, C, D level 7 -1/7 - 2 (Eisenberg 7 - 7R150670)
201 W CENTER ST, Rochester
Alterations to existing bathrooms 10W-36, 37 & 37A (Methodist Eisenberg 10 - 7R130950)
201 W CENTER ST, Rochester
Electrical - Alterations to existing bathrooms 10W-36, 37 & 37A (Methodist Eisenberg 10 - 7R130950)
201 W CENTER ST, Rochester
Electrical - Install electrical for Med Vac Pump in Sub Level MAYO EISENBERG 7R150440
201 W CENTER ST, Rochester
Alterations for power substation RM-B-1A/B upgrade (Methodist - Eisenberg Subway - 7R271150)
201 W CENTER ST, Rochester
Electrical - Alterations for power substation RM-B-1A/B upgrade (Methodist - Eisenberg Subway - 7R271150)
201 W CENTER ST, Rochester
Electrical (low voltage electrical installation) - Alterations to intensive care units #A, B, C (Methodist Eisenberg 10 - 7R140230)
201 W CENTER ST, Rochester
MAYO - EISENBERG - 10th FLOOR:W-36, Annual Restroom Upgrade WO 338277 Scott Beckel, Construction Manager
201 W CENTER ST, Rochester
MAYO - EISENBERG - SL-067, REM, WO 336777 WORK DONE PER PLANS AND SPECIFICATIONS FOR WEEK ENDING 11/26/2016
201 W CENTER ST, Rochester
MAYO - EISENBERG - EI:10:W-36:TOILET-MEN, BATHROOM UPGRADES WO 338277/4916-129
201 W CENTER ST, Rochester
MAYO - EISENBERG - EI:LO:12-08:CORRIDOR; REPLACE DRINKING FOUNTAIN WO 338478/4916-127
201 W CENTER ST, Rochester
MAYO - EISENBERG - EI:SL:4-01:ELEVATOR LOBBY; REPLACE SUMP PUMP WO 337407/4916-128
201 W CENTER ST, Rochester
Electrical (low voltage electrical installation VFD fan controls) - Normal power electrical distribution panel upgrade (Methodist - Eisenberg - 7R151010)
201 W CENTER ST, Rochester
MAYO - EISENBERG - EI:SL:24C:OFFICE; REPLACE ROTTEN DRAIN PIPE WO 338194/4916-123
201 W CENTER ST, Rochester
MAYO - EISENBERG - 7-230A, REM, 336475 WORK DONE PER PLANS AND SPECIFICATIONS FOR WEEK ENDING 10/15/2016
201 W CENTER ST, Rochester
Electrical (low voltage temperature/VFD control) Alterations bid pack 1 mainly demolition west & south wing on level 7 - 1/7 - 2 (Eisenberg 7 - 7R150670)
201 W CENTER ST, Rochester
Mechanical (ductwork, demo, fan coil unit) - Normal power electrical distribution panel upgrade (Methodist - Eisenberg - 7R151010)
201 W CENTER ST, Rochester
Hydronic (add chilled water lines for new fan coil supplied by others) - Normal power electrical distribution panel upgrade (Methodist - Eisenberg - 7R151010)
201 W CENTER ST, Rochester
MAYO - EISENBERG - SL-029 REM 336762; SL-067 REM 333588; AND SL-081 REM 333608/R6590 WORK DONE PER PLANS AND SPECIFICATIONS FOR WEEK ENDING 09/24/2016
201 W CENTER ST, Rochester
Electrical (DP1A/B replacement) - Normal power electrical distribution panel upgrade (Methodist - Eisenberg - 7R151010)
201 W CENTER ST, Rochester
Normal power electrical distribution panel upgrade (Methodist - Eisenberg - 7R151010)
201 W CENTER ST, Rochester
MAYO - EISENBERG - LO-106, REM, 332017 AND 4-102, REM, 334770 NIGHTS--WORK DONE PER PLANS AND SPECIFICATIONS FOR WEEK ENDING 09/17/2016
201 W CENTER ST, Rochester
Electrical - Alterations bid pack 1 mainly demolition west & south wing on level 7 - 1/7 - 2 (Eisenberg 7 - 7R150670) #8734
201 W CENTER ST, Rochester
Adding fixtures for: Alterations bid pack 1 mainly demolition west & south wing on level 7 - 1/7 - 2 (Eisenberg 7 - 7R150670) DMC #16610
201 W CENTER ST, Rochester
VAV & Radiant Panels FOR: Alterations bid pack 1 mainly demolition west & south wing on level 7 - 1/7 - 2 (Eisenberg 7 - 7R150670) DMC #16610