Rochester, MN
Rochester, MN
3201 SE HARBOR HEIGHTS CT, Rochester
Installing (1) door on main floor of home, door installed to rough opening/cut in with new header.
201 SW 28 ST, Rochester
10 full frame windows 1 2LS in bedroom 1 (at grade and 5.944 sq ft) 1 2LS in bedroom 2 (at grade and 5.944 sq ft) 1 2LS in kitchen 3 DH in kitchen 2 DH in bedroom 3 (above grade and 5.92 sq ft) 1 DH in dining room 1 Pic in bathroom - creating opening for future bathroom | Other
2015 NW 51 ST, Rochester
Water heater replacement
2014 SW KAL LN, Rochester
Bathroom remodel with Mad CIty - RPH20412
201 W CENTER ST, Rochester
ROXX23C0350 - 4,100 SF Renovation of existing areas in Lobby and Subway Level of Eisenberg, and the 9th Floor of Gonda. This permit is for the Gonda portion and is connected to building permit R25-0062CB.
2014 SW KAL LN, Rochester
2 Bath Job: 2nd level tub to tub conversion, exposing part of ext wall, apply 3M S80 Security Film 2nd level shower stall to shower pan conversion, move drain/plumbing, apply 3M S80 Security Film
201 W CENTER ST, Rochester
Mechanical HVAC work within Eisenberg Building for project #ROXX23C0350 / #25306
201 W CENTER ST, Rochester
Replace old water heater
201 W CENTER ST, Rochester
-Eisenberg Subway Level -Relocate eisenberg subway level occupants for theranostics ROXX23C0350
201 W CENTER ST, Rochester
Eisenberg subway level -Relocate Eisenberg subway level occupants for theranostics ROXX23C0350
2201 SW 1 AVE, Rochester
BASEMENT FINISH BY OTHERS
201 W CENTER ST, Rochester
Mechanical work associated with the Mechanical work related to the renovation of the existing HVAC system for the new MRI installation. Install a new cryogen vent for the MRI. Mayo # ROEI24C0010 RST Incremental PET-MR on Eisenberg Subway Harris # 0800388-N5080
2201 SW 1 AVE, Rochester
Work on water damaged house. New fiberglass shower in main and basement bath. Reinstall fixtures. Reinstall kitchen sink
2015 NW 41 ST, APT A22, Rochester
Water heater install
2201 SW 1 AVE, Rochester
Replace insulation and vapor barrier in basement and 2' up in main floor. New electrical in basement. Bath remodel up and down. New kitchen cabinets and sink
201 W CENTER ST, Rochester
Temperature Controls for Eisenberg Lobby Level - ROXX23C0350 RST Relocate Ei SL Occ
201 W CENTER ST, Rochester
Mayo-Eisenberg Building-03-2 -Electrical work to hang single use devices -Mayo work order number 0086879 Adair work order number W9221 -This work is T&M
201 W CENTER ST, Rochester
Mayo-Eisenberg Building-Penthouse -Electrical work to install temp power -Mayo work order number 0088144 Adair work order number W9237 -This work is T&M
2201 SW 1 AVE, Rochester
Rewire basement due to damage from water. Replace all wiring in basement.
201 W CENTER ST, Rochester
Electrical work for Mayo# ROXX23C0350 - 4,100 SF Renovation of existing areas in Lobby and Subway Level of Eisenberg. Egan foreman: Jeff Taylor 507-272-2514 Egan Job# 613057-910
201 W CENTER ST, Rochester
Temperature Controls for Eisenberg Subway - ROEI24C0010 RST Incremental PET-MR
201 SW 1 AVE, Rochester
Hydronic work associated with the installation of VAV coil kits and heating hot water piping. Mayo # ROXX22C0440 - Mayo 19 Expansion and Remodel Harris Job# 0800399-N5080
201 W CENTER ST, Rochester
ROXX23C0350 - 4,100 SF Renovation of existing areas in Lobby and Subway Level of Eisenberg, and the 9th Floor of Gonda.
201 W CENTER ST, Rochester
Mayo-Eisenberg Building-Subway Level-4D -Electrical work to expand locker room -Mayo work order number 0063223 Adair work order number W8985 -This work is T&M
1201 S BROADWAY AVE, STE B, Rochester
Remove (2) York 5-Ton RTU unit and replace with (2) York 5-Ton RTU units.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.