Rochester, MN
Rochester, MN
273 NE PENNY LN, UNIT# 201, Rochester
Add 6 outlets and light for mezzanine
1201 SW 12 ST 901, Rochester
Re-roof for Macy's at Apache Mall (Ste. 901)
2010 SE 11 AVE, UNIT# D, Rochester
Install Water Heater
2018 NE GLENDALE HILLS DR, Rochester
ac
2018 NE GLENDALE HILLS DR, Rochester
REPLACE AC
201 SE 4 ST, Rochester
Rework of existing blue carts for city of Rochester please use PO#935597-196493
2201 NE GLADY LN, Rochester
ac
201 SW 28 ST, Rochester
Service upgrade
2201 NE GLADY LN, Rochester
AC REPLACEMENT
201 SW MEADOW RUN DR, Rochester
furnace ac
201 W CENTER ST, STE# LO92, Rochester
Security enhancements at the entrances to the labor/delivery practice including a limited remodel of Eisenberg 3 and potentially space for a new HID safe visitor access kiosks in the lobby level of Eisenberg. ROEI22C0020 Adair-16439
2010 NE NORTHVIEW LN, Rochester
ac rewire
1201 S BROADWAY AVE, STE# 100, Rochester
Addition of an exterior door for Chik-fil-A
1201 SW 12 ST, Rochester
Caribou Coffee 19g electric water heater installation
2015 NW 41 ST, APT# G5, Rochester
Replace 40 gallon water heater with new.
201 W CENTER ST, Rochester
Mayo Project ROMB19C0070 - Pediatric Infusion Therapy Center Eisenberg Building Eighth Floor Ventilation modifications per plans issued by HGA, remove and relocate existing diffusers and grilles as noted. Furnish and install new diffusers and grilles as noted. Fabricate and install new exhaust duct as shown on the plans issued for the project.
201 W CENTER ST, Rochester
Electrical work for Mayo# ROMB19C0070/James Kelly Pediatric Infusion Therapy Center remodel in the Eisenberg building Egan PM: Ben Lochner 507-273-3331 Egan Job# 611566-910
201 W CENTER ST, Rochester
ROMB19C0070/James Kelly Pediatric Infusion Therapy Center remodel
201 W CENTER ST, Rochester
MAYO - EISENBERG BUILDING LOBBY COFFEE KIOSK ELECTRICAL WORK FOR COFFEE KIOSK MAYO PROJECT ROEI21C0040 ADAIR JOB 16484
2015 NW 41 ST, APT# J11, Rochester
Emergency repair, 4-bank meter socket blew up overnight. J-ll meter socket. We installed a 200-amp meter main off to the side of 4-bank meter socket and fed it from the service lateral in the 4-bank meter socket. We blanked off old J-11 meter space in 4-bank and spliced in the load wires for J-11 into the new meter main with 70-amp 2 pole breaker.
201 SW MEADOW RUN DR, Rochester
REPLACE AC
2010 NE NORTHVIEW LN, Rochester
Furnace and air conditioner replacement
1201 SW 7 ST, Rochester
furnace, ac, stat
2015 NW 41 ST, APT# K34, Rochester
Water heater
1201 SW 12 ST, Rochester
1) Provide and install new HVAC grills, registers and diffusers per plans and specs. 2) Provide and install externally insulated supply air run out ducts serving the diffusers and new added return air duct distribution from (1) existing air handling unit to allow for lay-in diffusers and ducted return air. 3) Provide (1) Filter change at the existing air handling unit prior to turn over. 4) HVAC Air balancing.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.