Rochester, MN
Rochester, MN
1201 NE 10 AVE, Rochester
Hydronic (work for indoor air quality and kitchen alterations)- HVAC upgrade to include boiler, water heater, removing unit ventilators, DOAS units, thermal energy storage system, displacement terminal units & a new chiller. Upgrading fire alarm system, new distribution panel, architectural finish upgrades and full kitchen remodel (Rochester Schools - Jefferson Elementary School)
1201 NE 10 AVE, Rochester
Electrical for the indoor air quality for HVAC upgrade to include boiler, water heater, removing unit ventilators, DOAS units, thermal energy storage system, displacement terminal units & a new chiller. Upgrading fire alarm system, new distribution panel, architectural finish upgrades and full kitchen remodel (Rochester Schools - Jefferson Elementary School)
1201 NE 10 AVE, Rochester
Electrical - HVAC upgrade to include boiler, water heater, removing unit ventilators, DOAS units, thermal energy storage system, displacement terminal units & a new chiller. Upgrading fire alarm system, new distribution panel, architectural finish upgrades and full kitchen remodel (Rochester Schools - Jefferson Elementary School)
201 W CENTER ST, Rochester
Electrical work done for the week ending 06/08/2013 RMH - Eisenberg 10-3 REC / WO311391
201 W CENTER ST, Rochester
Electrical work done for the week of 06/01/2013 RMH - Eisenberg 9-E-67C REM / WO309756-R5361
201 W CENTER ST, Rochester
Hydronic (relocate hydonic piping) - eICU remodel (Methodist - Eisenberg 10 - 7R120490) (added 4/18/13/rb)
201 W CENTER ST, Rochester
Plumbing (relocate) - eICU remodel (Methodist - Eisenberg 10 - 7R120490) (added 4/18/13/rb)
201 W CENTER ST, Rochester
Electrical work for the week ending 05/25/2013 RMH - Eisenberg SL-32 REM / WO311015
2016 NW CHARDONNAY LN, Rochester
Reroof Garage (French Creek) 2016-2018-2020-2022 Chardonnay Ln NW
201 W CENTER ST, Rochester
Electrical work for the week ending 05/18/2013 RMH - Eisenberg 1-232 REM / WO311029-R5423
201 W CENTER ST, Rochester
Elevator Modification on penthouse level (Methodist - Eisenberg Penthouse level - 7R110230)
2018 SW WASHINGTON LN, Rochester
Electrical - Replace old deck with new screen porch and smaller deck & stairs
2012 NE 5 AVE, Rochester
Electrical - Added new wall, built ou 2 x 4 wall against foundation wall for new bathroom - added shower, toilet, sink - added false ceiling in bathroom (LL)
2012 NE 5 AVE, Rochester
Plumbing (Bath and replaced existing drain which was cast iron with PVC) - Added new wall, built ou 2 x 4 wall against foundation wall for new bathroom - added shower, toilet, sink - added false ceiling in bathroom (LL)
2012 NE 5 AVE, Rochester
Mechanical - Added new wall, built ou 2 x 4 wall against foundation wall for new bathroom - added shower, toilet, sink - added false ceiling in bathroom (LL)
2012 NE 5 AVE, Rochester
Added new wall, built ou 2 x 4 wall against foundation wall for new bathroom - added shower, toilet, sink - added false ceiling in bathroom (LL) | Basement Finish
2011 SW STARBURST DR, Rochester
New 14' X 14' Cedar Deck w/stairs | Deck Addition
201 W CENTER ST, Rochester
Plumbing - repair leaks on toilet carrier RMH - Eisenberg 10-202 Patient Room / WO311423
201 W CENTER ST, Rochester
Plumbing - install hand held shower RMH - Eisenberg 07-215 Patient Room / WO311477
2011 SW STARBURST DR, Rochester
Fireplace (Regency) - Lower level finish with family room, bath and 2 bedrooms - No fireplace
201 W CENTER ST, Rochester
Electrical work for week ending 04/27/2013 RMH - Eisenberg LO-11-09 REM / WO308276, & 1-55-ADM REM / WO310145
201 W CENTER ST, Rochester
Electrical work for the week ending 04/20/13 RMH - Eisenberg SL-41 REM / WO305791-R5119, & Eisenberg 1-358 REM / WO308100-R5358
201 W CENTER ST, Rochester
eICU remodel (Methodist - Eisenberg 10 - 7R120490) (added 4/18/13/rb)
2018 SW WASHINGTON LN, Rochester
Replace old deck with new screen porch and smaller deck & stairs | Porch Addition
201 W CENTER ST, Rochester
Mechanical - (eICU remodel (Methodist - Eisenberg 10 - 7R120490) (added 4/18/13/rb)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.