Rochester, MN
Rochester, MN
200 SW 1 ST, Rochester
Mayo - Mayo Building Electrical work for Communications Closets Security Upgrade Mayo Project ROXX22C0030 Adair Job 16900
2200 SW 2 ST, Rochester
REPLACE WATER HEATER
200 SW 1 ST, Rochester
Mayo - Mayo Building - Sl-BA45W - Electrical work to install PDX Controllers - Mayo WO 0056260 Adair WO W5570 - This work is T&M
200 SW 1 ST, Rochester
Mechanical work associated with the renovation of existing HVAC system. New GRD's & VAV's. Mayo #ROGO23C0020 Fix Fluoroscopy Harris Job #0800192-N5080
200 SW 1 ST, Rochester
Mechanical work associated with the renovation of existing HVAC system. New GRD's & VAV's Mayo # ROGO21C0100 Stryker Installation & Integration Harris Job #0800194-N5080
2007 NW 29 PL, Rochester
Siding Project Detach and Re-Attach 12 meter socket and disconnect bank. coordinate with RPU for disconnect and reconnect of service coordinate with electrical inspector
2006 SW SOUTHFIELD CT, Rochester
Basement finish. | Basement Finish
200 SW 1 ST, Rochester
ELECTRICAL WORK TO REMODEL PROCEDURE ROOMS TO SUPPORT NEW GENERATION FLUOROSCOPY ARMS. MAYO# ROGO23C0020 EGAN FOREMAN: PETE ULBRICHT 507-696-1999 EGAN JOB# 612200-910
200 SW 1 ST, Rochester
ROGO23C0020 - Remodel procedure rooms to support newer generation fluoroscopy arms to replace current equipment
2007 NW 29 PL, Rochester
200A temp service
200 SW 1 ST, Rochester
ELECTRICAL WORK TO REPLACE STRYKER EQUIPMENT. MAYO# ROGO21C0100 EGAN FOREMAN: PETE ULBRICHT 507-696-1999 EGAN JOB# 612201-910
200 SW 1 ST, Rochester
ROGO21C0100 - Installation and integration of Stryker SDC3 equipment.
130 NW ELTON HILLS DR, STE# 200, Rochester
There shall be no changes to the existing duct work or roof top units with economizers layout and occupied space has not changed and that will not require altering existing HVAC system >Existing Kitchen Hood and Kitchen Make-up Air to be disconnected at the roof. New Tenant will not be using the equipment.>Exhaust in kitchen will comply with Table 403.3.1.1 Kitchen at .7 CFM per square feet. 688 (ft2) for 481 CFM exhaust fan to be controlled by light switch
200 SW 1 ST, Rochester
Mechanical work associated with the installation of heating hot water to 18 new VAVs. Mayo # ROGO23C0010 - Gonda CCC Install Harris Job #0800213-N5080
200 SW 1 ST, Rochester
Mechanical work associated with the installation of 18 new VAVs & a few new fire smoke dampers. Mayo #ROGO23C0010 - Gonda CCC Install Harris Job #0800213-N5080
200 SW 1 ST, Rochester
Plumbing work associated with the installation of a new sink and hot water dispenser. Mayo #ROGO23C0010 - Gonda CCC Install Harris Job # 0800213-N5080
200 SW 1 ST, Rochester
M0032777 Justin Bernard Shifting some staff to remote work. Would like to reconfigure the space to better utilize care team, collaborative model
200 SW 1 ST, Rochester
Mechanical work associated with Ductwork changes for new collaboration space. Mayo# M0032777 Harris# Y080018091-N5080
200 SW 1 ST, Rochester
Additional work for the Harwick 4 North - Unbound Prototyping Space - Plumbing is only on CCD #2, previously only had a Hydronic permit for the work on the main job, which is now closed. #ROHA23E0010 / #23611
5200 NW 3 ST, Rochester
Finishing the basement to include bedroom and storage. | Basement Finish
200 NE 15 ST, Rochester
GAS LINE FROM METER TO INSIDE MANIFOLD FROM MANIFOLD TO WATER HEATER/FURNACE
200 SW 1 ST, Rochester
New vav
2008 SE 25 ST, Rochester
Wire AC
2008 SE 25 ST, Rochester
Replace AC
2008 SE 25 ST, Rochester
Replace Water Heater
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.