Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1200 26TH ST W, Minneapolis
Replace staybolt on boiler # 4.
200 6TH ST S, Minneapolis
FOR 31ST FLOOR - TOILET, WALL HUNG LAVATORY, STAINLESS STEEL SINGLE COMPARTMENT SINK AND 2 INCH DIAMETER FLOOR DRAIN
2006 6TH ST S, Minneapolis
dish washer
200 6TH ST S, Minneapolis
TENANT OFFICE REMODEL TO 7,460 S.F AT NORTH SIDE OF 31ST FLOOR. DEMO EXISTING FOR NEW OFFICES, OPEN OFFICES, SMALL CONFR RMS AND EMPLOYEE BREAKROOM. (DMH#1) INSTALL NEW SINGLE USER ADA RESTROOM AT WEST END CORRIDIOR. CHANGE IN CORRIDOR EXIT PATH. N
1200 26TH ST W, Minneapolis
PLUMBING REMODEL ON 3 FLOORS INCLUDING KITCHEN
200 46TH ST W, Minneapolis
Tear off and reroof house only
200 6TH ST S, Minneapolis
15th floor - rework new ductwork and diffusers per plans
200 6TH ST S, Minneapolis
install plumbing for 2 single restrooms skyway level
200 6TH ST S, Minneapolis
KITCHEN SINK 15TH FLOOR
200 6TH ST S, Minneapolis
Tenant Improvement - Partial 15th Floor certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 155 sprinklered: yes Tenant: US Bank Floor(s): 15 arch
1200 26TH ST W, Minneapolis
Per engineered drawings -heating/vent/AC/refrigeration - Jefferson Elem. No Kitchen at this time. will pull separate permit for kitchen.($35,000 value not included) 3 LP Boilers (2) @ 3066mbh & 1 @ 575mbh with associated equipment and piping- shell & tu
2003 6TH ST NE, Minneapolis
furnace
1200 26TH ST W, Minneapolis
SITE RECONFIGURATION WITH INTERIOR REMODEL, HVAC UPGRADE, (MAA #01) certificate of occupancy required NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required
200 6TH ST S, Minneapolis
16TH FLOOR: A/C, DUCTS, DIFFUSERS, & VAV'S
200 6TH ST S, Minneapolis
19TH FLOOR SOUTH TOWER - DUCT AND VENTILATION MODIFACATIONS PER ENGINEERED DRAWINGS
1200 26TH ST W, Minneapolis
INTERIOR DEMO FOR FUTURE REMODEL AT SFD (MAA #02) architect: MATHEW JOHNSON MN REG% 25733 engineer:
200 6TH ST S, Minneapolis
19th Floor, demo 2 sinks 2 elec water coolers install water heater ice maker and lines. run w/v and water piping to new fixtures. install sink and faucet
2007 36TH AVE NE, Minneapolis
fire place
200 6TH ST S, Minneapolis
TENANT IMPROVEMENT 19TH FLOOR. TWO HOUR FIRE RESISTIVE RATING REQUIRED FOR FLOOR CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS certificate of occupancy required: no special inspections required: yes const type: 1A occupancy: B
200 6TH ST S, Minneapolis
Green and the Grain
200 6TH ST S, Minneapolis
FOR 16TH FLOOR BREAKROOM: BREAKROOM SINK, WATER HEATER AND FLOOR DRAIN
200 6TH ST S #2ND FLOOR, Minneapolis
green + grain 2nd fllor north suite 3 Daikin Fan Coil Units. Exhaust and Walk-in cooler @ 24,000
200 6TH ST S, Minneapolis
NEW RESTAURANT IN SHELL SPACE (MAA #02) ********EXIT DOORS TO PROVIDE PANIC HARDWARE certificate of occupancy required YES mechanical plans required for certificate of occupancy YES mechanical plans/letter of means of compliance submitted\YES
1200 26TH ST E, Minneapolis
air cleaner and furnace
1200 26TH ST W, Minneapolis
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.