Saint Cloud, MN
Saint Cloud, MN
77
6
$1,243,000
Move sink over 10 feet
Entryway remodel 6 circuits
03-872 CCH RIVER CAMPUS LIGHTING UPGRADE - LED LIGHTING RETROFIT
Replace and update signage with new brand standards for 2026. Includes update to building signage, replacement of existing monument sign with new, and replacement of directional signage around parking lot.
Replace RPZ/Backflow Preventor
Furnace replacement - Lennox Merit 96% 70K B Cabinet Single Stage Furnace
Furnace replacement - Lennox Merit 96% 70K B Cabinet Single Stage Furnace
Replace existing EPDM roof membrane with a new ballasted EPDM roof membrane. Add additional tapered insulation to improve roof drainage.
J9046 Electric Unit Heater
Install wiring, lighting and receptacles per remodel due to fire and smoke damage
Demo as noted on plans, replace diffusers per plans
Interior renovation of main floor of an existing bank branch building with no changes to occupancy load or egress ways. New main floor consists of: breakroom, restroom, hallway, teller area, coupon room, vault, vault lobby, living room, vestibule, financial advisor office, office, premier banker office and focus room.
EXTERIOR renovation work including new exterior cladding, exterior painting, new exterior slatted wall, new site lighting. Refer to Civil drawings for site scope which includes ADA compliance work at ADA ramps, parking stalls, paths of egress, etc. Signage shown for coordination purposes only and a separate signage permit will be applied for at a later date by others.
Furnace replacement
Furnish & Install in new location: 1 - drinking fountain We will Reinstall: 1- lav & 1 - water closet
Rebuild garage and repair breezeway after fire damage.
WELLS FARGO REMODEL
REPLACE 100K BTU FURNACE AND 4 TON AC
Demo (2) double stacks of wood framed decks and (2) single stacks of wood framed decks for a total of (12) decks. Install Juliete metal railings in place of the decks.
replacement window and patio door
Install a 5 ton rooftop set on the ground with supply and return duct work. Gas pipe the unit and vent 3 bathrooms
New 200 amp service. 25 new circuits for new office wiring.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.