$2,106,750
Toilet, lav, floor drain, kitchen sinks, electric WH
remodel first floor office space. certificate of occupancy required: no const type: 3b occupancy: b 2020 MSBC sprinklered: yes Tenant: white crane sac: _0_ charges __ met council letter dated _5/9/24_
remodel 2d floor bathrooms and corridor extension. certificate of occupancy required: no const type: 3b occupancy: b 2020 MSBC sprinklered: yes architect: shea
DEMOLISH EXISTING BATHROOMS AND BUILD NEW BATHROOMS. NO STRUCTURAL WORK. (JJL) certificate of occupancy required: no special inspections required: no const type: III-B occupancy: B, S-1 2020 MSBC occupant load: 115
8 Toilets, 7 lavs, 1 drinking fountain, 1 urinal, 1 shower, 4 floor drains
Flat Roof - Ballasted EPDM General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classification of Section 1505 and the material requirements as spec
NEW DOORS & WINDOWS certificate of occupancy required: no special inspections required: no const type: 3-B occupancy: B 2020 MSBC occupant load: no change sprinklered: yes energy code chapter used: 1323 archite
Demo Only - Building B, 2nd Floor certificate of occupancy required: no special inspections required: no occupancy: B 2020 MSBC architect: Nathaniel Shea #24515
INSTALL PARTION WALLS (METAL STUDS AND 5/8" GYP BD) TO ENCLOSE EXISTING OPEN OFFICE SPACE AT FIRST FLOOR - APPROX 3,687 SF AREA. NEW OPENING IN WALL FOR 2ND EXIT. NO WORK AT SURROUNDING EXISTING OFFICES. (LAH) const type: III occupancy:
INTERIOR DEMO OF NO LOAD BEARING WALL APPROX 25 FT AT CENTER OF BUILDING THIS PERMIT DOES NOT CHANGE OCCUPANCY OR CREATE ANY NEW OCCUPANCY AREAS. ORIGINALLY CONSTRUCTED BY SAME CONTRACTOR.