buildout warehouse storage space. approx 7000 sq ft in far northwest corner of building. certificate of occupancy required: no const type: 2b occupancy: S1 2020 MSBC sprinklered: yes Tenant: amazon sac: _0_ charge
install one sink and waste, water lines to existing services with in tenant space
Tenant improvement of new suite in existing building -ACW certificate of occupancy required: no special inspections required: no const type: IIIB occupancy:B 2020 MSBC occupant load: 36 sprinklered: yes Floor(s
New RTU for bldg. a level 2. Work includes associated duct and gas pipe systems intended for new tenant space. BLDG1163979
T/I EXPAND OFFICE, 2ND FLOOR const type: IIIB occupancy: B 2020 MSBC occupant load: 14 sprinklered: YES architect: 24515 - Shea, Nathaniel William @ TANEK
HVAC system for tenant buildout, installing GRDs and all associated ductwork per approved plans.
T/I SUITE 205 const type: III-B occupancy: B 2020 MSBC architect: 24515 - Shea, Nathaniel William
Tenant Improvement - Suite 135 - About Face Facial Studio certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. const type: III
rough in only, 2 sinks, 1 washer box, floor drain and electric water heater
CONSTRUCT WALL FOR PACKAGE DELIVERY. (JJL) certificate of occupancy required: no special inspections required: no const type: III-B occupancy: B, S-1 2020 MSBC occupant load: NO CHANGE sprinklered: yes Tenant:
SUITE 235. BUSINESS REMODEL. (JJL) certificate of occupancy required: no special inspections required: no const type: III-B occupancy: B, F-1, S-1 2020 MSBC occupant load: 4 sprinklered: yes Tenant: SSQTCH
Tenant Improvement - Suite 130 - New Mercantile Tenant w/ New Exterior Entrance certificate of occupancy required: no special inspections required: no const type: 3B occupancy: M 2020 MSBC occupant load: 7 sprinklered: ye
FOR WATKINS BUILDING BREAKROOM - ADD SINK AND DISHWASHER OFF OF EXISTING 2" DRAIN LINE
(DMH-ProjectDox) SELECT DEMO AND NEW METAL FRAMING, OVERHEAD DOOR AND SERVICE DOOR FOR 380 SQ. FT. STORAGE ROOM AT 2ND FLOOR Const type: III-B Occupancy: S-2 2020 MSBC Occupant Load: (Archit calc.) Existing Sprinkler: YES
T/I SUITE 120 2020 MSBC architect: 24515 - Shea, Nathaniel William
2nd floor office build-out - approx 2700 sq ft. suite 200. certificate of occupancy required: no const type: 3b occupancy: b 2020 MSBC sprinklered: yes Tenant: wedge co-op sac: _0_ charges __ met council lett
FOR CHIROCENTER STORAGE ROOM -SUPPLY AND INSTALL MOP SINK, WASHER BOX AND FLOOR DRAIN
2-floor mounted ADA tank type water closets 2-wall hung lavs with manual faucets and mixing valves 1-24 mop basin with chrome wall mounted faucet
Main Floor Office Remodel - Suite 100 - ChiroCenter certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. const type
Duct work and piping work per engineer plans.
HVAC system, reusing two existing VAV boxes and installing new exhaust fan, GRDs and all associated ductwork per approved plans.
BUILDING A, SUITE 110. TENANT IMPROVEMENT. (JJL) certificate of occupancy required: no special inspections required: no const type: III-B occupancy: B, S-1 2020 MSBC occupant load: 18 sprinklered: yes 20% acces
We are installing a kitchen sink on existing rough ins Permit Scope 1- ADA sink 1-waterline serving fridge 1-waterline serving coffee maker 1-dishwasher (electrician required)