1920 1ST ST S #D114, Minneapolis
Replace 4 Pipe Fan Coil
1920 1ST ST S #1201, Minneapolis
(DMH-ProjectDox) BATHROOM REMODEL IN UNIT #1201. IN MULTI-UNIT BUILDINGS, COMMON PARTY WALLS MUST USE SAME OR EQUIVALENT MATERIALS TO MAINTAIN FIRE & SOUND SEPARATION. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT B
1920 1ST ST S #D114, Minneapolis
Replace shower base and install new valve Upgrade near piping
1920 1ST ST S #2306, Minneapolis
REPLACE SHOWER VALVE AND REMOVE AN REINSTALL TOILET
1920 1ST ST S #907, Minneapolis
Replace tub/shower valve, trim, and bathroom sink faucet in unit #907
1920 1ST ST S #602, Minneapolis
Replace dishwasher
1920 1ST ST S, Minneapolis
FOR WASTE & VENT STACK #2 - Demo existing waste and vent stack (#2) and replace. Floors 1-23
1920 1ST ST S #902, Minneapolis
FOR BATHROOM REMODELING: Demo existing fixtures. Install a new shower pan and posi temp valve. Hook drain into existing sewer and bring up to code if necessary.
1920 1ST ST S #902, Minneapolis
bathroom remodel. unit 902.
1920 21ST ST W, Minneapolis
Main house and detached garage - reroof with tear-off. Install code required underlayments. Install new architectural shingle to mfg spec.
1920 1ST ST S #1908, Minneapolis
replace tub with shower in unit 1908.
1920 1ST ST S #1908, Minneapolis
REPLACE TUB WITH SHOWER
1920 1ST ST S #705, Minneapolis
Unit #705; replace angle stops for water closet and lav, rough in tub/shower, install fixtures
1920 1ST ST S, Minneapolis
REPLACE BACONOES TO BRING TO CODE (MAA) AS PER PHONE CONVERSATION WITH JOHN THE APPLICANT HE IS AWARE THAT ANY OPENINGS IN THE RAILINGS TO BE LESS THAN 4" ENGINEER: MICHAEL TILLEMAN 54526
1920 1ST ST S #107, Minneapolis
KITCHEN SINK
1920 1ST ST S, Minneapolis
demo stack #7 and replace per plans
1920 1ST ST S, Minneapolis
Demo existing stack (#6) and replace per plans. Floors 13-23 (Floors 1-12 Stack (#6) replaced 1/2022-Plumbing/BLDG925009)
1920 1ST ST S, Minneapolis
replace burner in existing boiler
1920 1ST ST S, Minneapolis
REPLACE WASTE STACK - Demo existing stack and replace from Floors 1-12
1920 1ST ST S, Minneapolis
Interior wall work for plumbing stack replacement WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS FIRE PARTITIONS IN ACCORDAN
1920 1ST ST S #1409, Minneapolis
REPLACE PATIO DOOR
1920 1ST ST S #1005, Minneapolis
Replace tub/shower valve and trim, replace water closet. (may redo waste and overflow, but not approved yet)
1920 1ST ST S #902, Minneapolis
#902 - kitchen sink, disposal, dishwasher, icemaker
1920 1ST ST S #1001, Minneapolis
DISHWASHER
1920 1ST ST S #605, Minneapolis
(DMH - ProjectDox) WATER DAMAGE REPAIRS AT 6TH FLOOR CORRIDOR AND ISOLATED ADJACENT SPACES. REPAIRS MADE TO MATCH EXISTING. INSURANCE ADJUSTERS WORKSHEET ESTIMATE SUBMITTED. IF REQUIRED BY BUILDING INSPECTOR, SUBMIT CONSTRUCTION DRAWINGS FOR PLAN R