Minneapolis, MN
Minneapolis, MN
15
10
$1,204,953
tearoff and reroof area 1(F).
Replace 2 ton split system w/RTU Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in the 2024Minnesota Energy Code Sections 5.5.3.1and 6.1.1.3.6 -which states al
REPLACEMENT 2 TON RTU Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in the 2024Minnesota Energy Code Sections 5.5.3.1and 6.1.1.3.6 -which states all mechanica
MN 1346.0101 Process piping and tubing shall be installed in accordance with ASME B31.3, Process Piping Code, or ASME B31.9 Drawing are located in for reference only folding in the drawing folder. BLDG1081291
NSTALL 3 VALVES TO BLOW DOWN PIPING
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.