Saint Cloud, MN
Saint Cloud, MN
Saint Cloud, MN
56301 1900 CENTRACARE CIR, #1, Saint Cloud
Installation of ballasted roof-top solar array @928 modules and structural components
1900 CENTRACARE CIR, #1, Saint Cloud
Installation of (7) Hydronic Hot Water VAVs and associated ductwork for the Level 2A Shell Space Buildout at the Plaza Expansion.
1900 CENTRACARE CIR, #1, Saint Cloud
CentraCare Plaza Expansion - Level 2A Shell Space Buildout
1900 CENTRACARE CIR, #1, Saint Cloud
New Storage Building. Footing and foundation insulation. Steel structure and semi heated building.
1900 CENTRACARE CIR, #1, Saint Cloud
Installation of ballasted roof-top solar array @928 modules 350kw AC/ 464kw DC with utility interconnection
1900 CENTRACARE CIR, #1, Saint Cloud
Removal of Existing 6" Domestic Water Main, and 8" Fire Protection Main (Ductile Iron Material). Re-pipe and replace with Stainless Steel Materials. Modify existing water softener system to include a larger brine tank, and a salt jet blow-in delivery system.
1900 CENTRACARE CIR, #1, Saint Cloud
A 51,500 Square foot addition - Climate Makers is installing the mechanical: (1) snowmelt heat exchangers, (2) Domestic Brazed Plate Heat exchangers, (10) Reheat Coils
1900 CENTRACARE CIR, #1, Saint Cloud
A 51,500 SqFt New build construction for PTOTSLP. Climate Makers is performing the Waste & Vent, Storm Drainage, and Domestic Water systems. The domestic water system scope reflects the installation of (1) Domestic water city main connection and (1) Fire Protection main connection. Installation of a new water softener, plate and frame heat exchangers for hot water, plumbing fixture, and a Sump Pump that serves the floor drains in the pool space. The Storm drainage system consists of a Primary and Overflow, with additional installation of drain tile around the Pool footings.
1900 CENTRACARE CIR, #1, Saint Cloud
Construct single story, steel construction, 59,915 sf physical therapy, occupational therapy and speech therapy and rehabilitation center connected to the main plaza building via a pedestrian walkway. The link is designed to make it easier for providers to move between clinics and the therapy area. The project also has a hydrotherapy pool that will be reviewed by the MN department of health.
1900 CENTRACARE CIR, #1, Saint Cloud
Wiring 7 5hp pumps to a 40kw portable generator for dewatering
1900 CENTRACARE CIR, #1, Saint Cloud
Build west portion of retaining wall with Recon precast concrete blocks on west side of plaza.
1900 CENTRACARE CIR, #1, Saint Cloud
03-835 CCH PLAZA PT/OT/SLP REHAB NEW BUILDING
1900 CENTRACARE CIR, #1, Saint Cloud
A 145,000 Square foot addition - Climate Makers is installing the mechanical: (4) Added Air Cooled Chillers, (4) New Condensing Boilers, (2) New Steam Boilers, (2) snowmelt heat exchangers, (3) Domestic Brazed Plate Heat exchangers, (1) Reheat Coil
1900 CENTRACARE CIR, #1, Saint Cloud
Renovation of a Pharmacy Space including: Demolition: Removal of (1) Existing Exhaust Fan Removal of (2) Existing Fume Hood & Controls New Installation: (1) Fume Hood Installation - equipment provided by Owner (1) New Lab Exhaust Fan (2) New VAVs (3) New Exhaust Air Valves (1) New Electric Radiant Ceiling Panel - Installed by Electrical (6) VAV controllers replaced - Existing VAV boxes to remain.
1900 CENTRACARE CIR, #1, Saint Cloud
Remove (1) Sink, and associated Piping Add (1) Sink And Associated Piping Add (1) Washer Box Connection Add (1) Emergency Eye Wash All For use in a pharmacy renovation
1900 CENTRACARE CIR, Saint Cloud
Interior demolition and remodeling of 1st floor Plaza Pharmacy. Demolition work includes removal of portions of existing ceilings, floor finishes, casework, walls, lighting, HVAC, and an alternate to remove the existing skylight. Renovation work includes new HVAC, floor finishes, casework, lighting, plumbing, pharmacy equipment, and an alternate to infill the skylight opening in the roof. Remodeled floor plan consists of: spiritual care room, 3 offices, hood room, compounding room, break room, restroom, specialty pharmacy room, delivery room, work stations, counsel room, reception area and OTC pharmacy waiting area.
1900 CENTRACARE CIR, #1, Saint Cloud
03-841 CCH PLAZA PHARMACY REMODEL
1900 CENTRACARE CIR, #1, Saint Cloud
Addition to existing Plaza Building. 165,000 sf, Lower and Three levels above grade. DLI is reviewing the State Licensed ASC expansion, footing and foundation package. The City of St Cloud is reviewing and permitting second and third floor clinical spaces B occupancy
1900 CENTRACARE CIR, Saint Cloud
Addition of a 40amp 480 volt 3 phase circuit to a new medical air compressor.
1900 CENTRACARE CIR, #1, Saint Cloud
Domestic Water, Storm Sewer, Sanitary Waste & Vent, Medical Gas Systems installation within the 165,000 square foot CentraCare Ambulatory Surgery Center expansion. Including both new system installation, and existing system connections.
1900 CENTRACARE CIR, #1, Saint Cloud
Temporary Heat
1900 CENTRACARE CIR, #1, Saint Cloud
Concrete retaining wall outside of MN DLI structural permit jurisdiction per conversations with Katherine Vollbrecht
1900 CENTRACARE CIR, Saint Cloud
Water service, sanitary service, storm sewer
1900 CENTRACARE CIR, Saint Cloud
03-806 CCH PLAZA EXPANSION - TEMP SERVICE ONLY
1900 CENTRACARE CIR, Saint Cloud
03-806 CCH PLAZA EXPANSION - TEMP SERVICE, FEEDING TOWER CRAND AND JOB TRAILERS
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.