Minneapolis, MN
Minneapolis, MN
8
6
$114,900
Double fee requested. BLDG1167865 2 - New 5-ton rooftops and gas piping. No new duct systems. Both RTU's will need to have economizers configured to operate as required by MN2024 Energy code. RTU 1 is without distribution duct system, drops only
Install ductwork to Tenant to existing rooftop, install exhaust fans for bathrooms. BLDG1153717
1st phase of adding 2 bathrooms and a abulation Room 4- foot washing stations
Modify existing office space and add accessible sloped walkway -ACW certificate of occupancy required: no special inspections required: no const type: VB occupancy: B 2020 MSBC occupant load: 12 sprinklered: yes
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.