Shakopee, MN
Shakopee, MN
16
9
$11,339,969
Install Water Softener for Facility
Bore 255' to place a new 1.25" conduit with fiber cable from an existing CenturyLink/Lumen handhole at Weston Ln and Greenwood Ct. to a new proposed handhole at 1615 Weston Ct.
Electrical Work including: • 600A Service • (1) 480/277V 600A 42Ckt • (2) 480/277V 200A 42Ckt • (2) 75KVA 480-208/120V transformer • (4) 208/120V 200A 42Ckt
INSTALL (182) SPRINKLERS FOR A NEW 2-STORY BEHAVIORAL HEALTH ADDITION. SUPPLY TO COME FROM THE EXISTING FIRE SPRINKLER SUPPLY VALVE ASSEMBLY WITH A NEW RISER FOR THE ADDITION SYSTEM
Wire new exterior sign for MVTA
Remodel/Addition of existing fire alarm system (LVC # 2500390-04)
1-illuminated channel letter set
Remodel/Addition of existing fire alarm system (LVC # 2500390-04)
New plumbing systems for building remodel per plans attached. Egan Job #516222
New Mechanical system for building remodel per plans attached. Egan Job #516222
Renovation of the existing bus garage portion of the Marschall Road Transit Station into a new 2-story mental health center.
Install concealed heads in play area
Furnish and install one new RTU including ductwork and gas piping per drawings
No building permit applied for - Have Dave verify work. Make existing warehouse/garage into a finished open area.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.