Rochester, MN
Rochester, MN
69
9
$263,891
1
Electriacl - install electrical (120V + 24V) wiring for automatic logic CTL System (like Johnson Ctl) for church and associated hall (a/c and heating ctls)
Mechanical - replace furnace & a/c
Reroof. (Church of the Resurrection)
Electrical - install underground wire (12-3UF) from garage to storage shed - install wiring for lights and 4 receptacles - 12' x 16' storage building. This is an existing building being moved onto this site. (Resurrection Catholic Church)
Modular Block Retaing Wall (CRENLO)
12' x 16' storage building. This is an existing building being moved onto this site. (Resurrection Catholic Church)
Install (2) new egress windows in basement, one story rambler, there is a larger window on the story directly above the placement of the window minimum 2 x 8 header, with minimum of 3' x 3' window well. | Other
Electrical - install 125 KVA 120/208 Volt emergency generator
Remodel church office area and replace heating/ac unit to office and new lighting. (Resurrection Catholic Church)
Mechanical HVAC work for the interior alterations. Remodel church office area and replace heating/ac unit to office and new lighting. (Resurrection Catholic Church)
Electrical/rewire lighting circuits (existing) for re-model of restrooms to office space. Add receptacles for new walls to existing circuits..Remodel church office area and replace heating/ac unit to office and new lighting. (Resurrection Catholic Church)
Mechanical/Gas-Piping: Gas piping for roof top unit; for the remodel of church office area and replace heating/ac unit to office and new lighting. (Resurrection Catholic Church)
Electrical - change lights in Robot area (Crenlo)
Electrical - wire hoist, lights and move outlets (Crenlo)
Electrical/install fire alarm system (do electrical wiring, install devices, new panel) per Custom Alarm drawings/plan for Fire Marshall requirements (violation 2007-654)
Remodel classroom into new men's and women's restrooms.
Adjust & repipe and install new fintube radiation for new men's and women's restrooms.
Move existing light switches, add 208V circuit for 30 gal water heater, add GFCI receptacles for new men's and women's restrooms and wire exhaust fans to existing circuit and move switches.
Plumbing for new men's and women's restrooms.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.