Minneapolis, MN
Minneapolis, MN
29
13
$65,221,678
HVAC system alteration, installing new air handling units, vav boxes, exhaust fans, hydronic piping, finned tube radiations, GRDs and all associated ductwork per approved plans.
Replacement of restroom fixtures and misc. related piping. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices used in the p
Replacing two 500 tons air cooled chillers and piping and associated accessories.
Walk-in cooler and freezer refrigeration system.
Hoods only, no duct attached to hood and no back splash wall panels. The hood submittals can be found in the drawing folder under for reference only file. BLDG1069859
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.