Rochester, MN
Rochester, MN
450
1
$27,360
Gas piping to MUA
Electric work to install 200 amp service
-Furnish and install ducting from existing RTU's (2 count) -Furnish and install Type 1 hood, MUA and exhaust fans. -Furnish and install electric unit heaters
DUCTWORK, GRD, VAV, DEMO
-Plumbing work for a tenant fitup. Chip Shot. -Installing floor drains, grease traps, mop basin and sinks. -All DWV and water piping
Install 40 Gallon Atmospheric water heater. Harris Job #278988
Replacing main floor bedroom windows [rental] | Other
Furnace & ac rewire
Gas stove
Adding gas line for gas range. will connect into existing line in garage. run underground outside. extend through exterior of house.
Installed gfci in the garage and a duplex receptacle for the garage door opener
replace rooftop Units - ETS add new rooftop unit - Active PT add new rooftop unit - Fit My Feet
Kitchen remodel, replace slider with single door | Other
Gas pipe new meter bank to leased tenants. Leased Tenants - ETS, Active PT rooftop/Fireplace, Fit My Feet, Chip Shots, Common Meter, Future offices
Kitchen Remodel - moving electrical outlets, kitchen lights
Electrical work for kitchen remodel
Kitchen sink and dishwasher with air gap.
Gas piping to new stove.
BATH FAN INSTALLATION
Rough in a new 6" vent for new kitchen hood and hang hood. 350CFM
Kitchen remodel | Other
A/C
Upgrade service from fuse box to breaker box
Install 200 amp outdoor panel with (4)- 50A 250volt outlets and (4)- 20A 120 volt gfci in 3 different locations for food vendors
Service upgrade. Add outlets throughout the basement.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.