Rochester, MN
Rochester, MN
151
24
$30,791,563
New 12 x 16, storage/concession baseball building (Mayo High School)
Electrical - intall new switch on main service MAYO HIGH SCHOOL
Wire underground line to existing detached garage - Add lights and outlets
Mechanical (replace exhaust fans, relocate floor heat vents) - Remodel Bathrooms (2) Second floor
Plumbing (existing sink, shower, toilets) - Remodel Bathrooms (2) Second floor
Remodel Bathrooms (2) Second floor | Other
Electrical - wiring for bathroom tile warming cable and exh fan/heater
Plumbing - move waste & vent pipes and change water pipes in house
Plumbing - water heater replacement
Mechanical - furnace and a/c replacement
Re-insulate home, reinforce 2x4 built home with additional 2x4's, re-sheet rock, frame small wall to extend kitchen wall height, remodel bathroom, reinforce attic space for loft storage (finished). Unfinished basement. | Other
Electrical - service upgrade/rewire house
Electrical - run power to concession stand for basement field MAYO HIGH SCHOOL BASEBALL FIELD - CONCESSION STAND
Electrical - install new disconnect on solar system MAYO HIGH SCHOOL
Alterations/Windows - cut in egress window in block of basement, see attached sheets, "option B" | Other
Add new door to existing band room. (Mayo High School)
Alterations to add the mounting system for new photovoltaic panels. (Mayo High School)
Mechanical - replace A/C
Hydronic - replace existing chilled water coils which are damaged, reconnect & reinsulate piping.
Replace stadium press box and 6944 square feet of service building roof. (Mayo High School)
Replace 3 Bedroom Windows with Egress (Rental) | Basement Finish
Installation of school score board MAYO HIGH SCHOOL (PO - BP09-00043)
Electrical for Installation of school score board MAYO HIGH SCHOOL
Electrical - Outlets in Dressing Room PO BP09-00043
Electrical/6KW Solar Electric System
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.