Rochester, MN
Rochester, MN
270
2
$17,183
Two Kozy Heat fireplaces. One at main floor and one in basement. Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage. Plan Locator number: 2017-035
Water heater replacement
Hydronic work for new Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage. Plan Locator number: 2017-035
Gas Piping - Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage. Plan Locator number: 2017-035
Plumbing - Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage. Plan Locator number: 2017-035
Mechanical (HVAC) - Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage. Plan Locator number: 2017-035
Modular block retaining wall
Plumbing - install water supply line for new humidifier MAYO HIGH SCHOOL
Plumbing - Install new temporary water heater MAYO HIGH SCHOOL
TEMP SERVICE FOR: Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage.
Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage.
Electrical - Single Family Dwelling, 2 Story with Finished Basement including a Pool Area below Garage, Elevator, Deck and 3 Stall Attached Garage.
Plumbing - add double check valve assembly and expansion at Water Meter (main floor closet under stairs) -
FOOTING AND FOUNDATION ONLY FOR: Single Family Dwelling
Install bath fan
egress window and Window well | Other
Install water heater
Remove existing cast iron boiler; replace with atmospheric equipment 256951
Water heater replacement 256951
Install furnace
Reroof sections 9,16,17,18 with associated MEP (Mayo High School)
Plumbing (replace/add roof drains & piping) - Reroof sections 9,16,17,18 with associated MEP (Mayo High School)
Mechanical (raise existing gooseneck ducts on the roof for new roof elevations) - Reroof sections 9,16,17,18 with associated MEP (Mayo High School)
Plumbing (install new roof drains, install new rainwater leader piping to accommodate new roof) - Reroof sections #2,3,21,22,23,24 with associated MEP (Mayo High School)
Gas Piping (remove existing gas piping from roof and reinstall when new roof is complete) - Reroof sections #2,3,21,22,23,24 with associated MEP (Mayo High School)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.