Rochester, MN
Rochester, MN
270
2
$17,183
Installing (3) windows on main level, front/north window has bay as existing, will be replacing with 3lite casement, installed to the rough opening, (2) windows on west side will be installed as inserts.
Mechanical HVAC work for new single family dwelling
Wiring for new single family home
Insert, in and out stops with mull cuts. #64 5/8" x 1" base shoe in. Wrap out in white.
Install Plumbing System for new home
Gas Piping work for new single family dwelling
Single family dwelling, slab-on grade with attached two-car garage
Footing and foundation for Single family dwelling, slab-on grade with attached two-car garage
Mayo High School: All new HVAC equipment, boilers, air handlers, duct and piping, new plumbing water lines, a new 2nd story addition to house HVAC equipment, structural changes to support equipment, select areas of roofing, ADA updates, flooring, paint, electrical service changes, lighting, multiple electrical panel updates, generator replacement, Data cabling, camera replacement DAS system, auditorium seat replacement, select kitchen equipment replacement and other small items improvements
Electrical work for Mayo High School: All new HVAC equipment, boilers, air handlers, duct and piping, new plumbing water lines, a new 2nd story addition to house HVAC equipment, structural changes to support equipment, select areas of roofing, ADA updates, flooring, paint, electrical service changes, lighting, multiple electrical panel updates, generator replacement, Data cabling, camera replacement DAS system, auditorium seat replacement, select kitchen equipment replacement and other small items improvements Egan Foreman: Jon Kroening 612-282-7889 Egan Job# 613730-910
Plumbing work per plans for Mayo High School mechanical renovation
Hydronic piping work per plans for Mayo High School mechanical renovation project
HVAC ductwork per the project plans
reshingle
Mayo HS Chiller Building
Install new 200 amp overhead service on the rear of the home Install 2" service mast through the roof
Gas piping work for new chiller pump building and tunnel feeding to existing Mayo HS.
Basement shower stall to shower pan, exposing part of ext wall
Basement shower stall to shower pan conversion, relocate drain if needed, exposing part of ext wall, install hardwired smoke/CO req in adjacent bedroom if interconnectivity exposed, existing vent fan, no additional fixtures | Other
INSPECT ELECTRICAL SO RPU CAN GET POWER TURNED BACK ON
Shell 1,480 SF addition to the existing 3,230 SF utility outbuilding for boilers, water heaters and an electrical room located in the parking lot north of the school building.
New dedicated circuit for sump pump gfci protected breaker
Replace entry door - no change to existing opening
Basement finish
Remove some of the old ductwork and add ductwork for basement remodel. Add bath fan for basement bath.