Minneapolis, MN
Minneapolis, MN
11
9
$60,805
Install panasonic fv-0511vfc1 80-110 cfm bath fan
relocate and replace fixtures in primary bathroom
NON-STRUCTURAL MAIN FLOOR BATHROOM REMODEL - INSTALL NEW TILE AT SHOWER SURROUND (EXISTING LOCATION) AND BATHROOM FLOOR, REPLACE WC AND LAV IN SAME LOCATIONS. EXISTING WINDOW TO REMAIN. INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CAVITIES E
REPLACE FRONT ENTRY CONCRETE STEPS. (JJL) CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOWE
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.