1301 2ND AVE S, Minneapolis
REMODEL OF FINISHES IN CONVENTION CENTER. LEVEL 1, MEZZANINE LEVEL, AND LOWER LEVEL. (JJL) TYPE 1A CONSTRUCTION ENGINEER: MBJ - MATT SMITH #49530 ARCHITECT: ALLIANCE - CAREY BRENDALEN #20915
1301 2ND AVE S, Minneapolis
Hookup Temporary 3 Compartment sink with hot and cold water in Hall C/D. Install Monday 8/5 and removed Thursday 8/8.
1301 2ND AVE S, Minneapolis
Hookup Temporary 3 Compartment sink with hot and cold water in Hall B. Install Wed 4/18 and removed Mon 4/22.
1301 2ND AVE S, Minneapolis
per email from applicant - project is to install approx. 200 new diffusers with demo of the old, installation of the new, and then test and balance the systems that are affected.
1301 2ND AVE S, Minneapolis
New ceiling diffusers and branch ductwork per approved plans.
1301 2ND AVE S, Minneapolis
Exhibit Halls A-D - Remove and replace doors certificate of occupancy required: no special inspections required: no occupancy: A-3 2020 MSBC sprinklered: yes architect: Carey Brendalen #20915
1301 2ND AVE S, Minneapolis
MEETING ROOM 103, MINNEAPOLIS CONVENTION CENTER. INTERIOR REMODEL OF MEETING ROOM 103. NEW FINISHES, CEILING, WALLS, MECHANICAL AND ELECTRICAL UPGRADES. NO STRUCTURAL WORK. (JJL) certificate of occupancy required: no special inspections required:
1301 2ND AVE S, Minneapolis
Hookup Temporary Drain line Hall C/D. Install date 10/9/23 and removal date 10/12/23
1301 2ND AVE S, Minneapolis
Hookup Temporary 3 compartment sink with hot and cold water in Hall CD. Hookup Aug 7th and removal Aug 9th
1301 2ND AVE S, Minneapolis
Ceiling and lighting upgrade project. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: A3 2020 MSBC occupant load: NO CHANGE FROM PREVIOUS LOAD sprinklered: ye
1301 22ND AVE NE, Minneapolis
Replacing existing furnace
1301 2ND AVE S, Minneapolis
acoustic ceiling replacement in corridors.
1301 2ND AVE S, Minneapolis
Ceiling and Lighting Upgrade in Public Corridors outside of Exhibit Hall 'E' certificate of occupancy required: no special inspections required: no occupancy: A3 2020 MSBC sprinklered: yes architect: Jay Wiederholt #47596
1301 2ND AVE S, Minneapolis
replace waste piping in ceilings after hours
1301 2ND AVE S, Minneapolis
FOOD 1ST FLR CORRIDORS & MEZZANINES A-F: DIFFUSERS
1301 2ND AVE S, Minneapolis
(DMH-ProjectDox) REMOVE AND REPLACE (7) SEVEN EXHIBIT HALL DOUBLE DOORS AT LOBBY 'E' IN CONVENTION CENTER. Architect: KEN SHEEHAN, #43965 (ALLIIANCE APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS R
1301 2ND AVE S, Minneapolis
replace diffusers
1301 2ND AVE S, Minneapolis
EXHIBIT HALL B INSTALL 2 TEMPORARY 3 COMPARTMENT SINK WITH 2 ELECTRIC WATER HEATERS IN EXHIBIT HALL B. INSTALL JULY 19TH, REMOVAL JULY 22ND
1301 2ND AVE S, Minneapolis
1301 2ND AVE S, Minneapolis
Relocating GRDs per attached plan.
1301 2ND AVE S, Minneapolis
TELECOMMS EQUIPMENT - REPLACE & INSTALL ----- engineer: JOSHUA ERIC HERZOG - 42392 engineer: THOMAS LAWRENCE MACH - 42357 - "[T]he framing members have been analyzed and have been found to have SUFFICIENT CAPACITY to support the proposed equipment."
1301 2ND AVE S, Minneapolis
tearoff and reroof eastern quarter of convention center with new PVC system. scope of work and area map in attachments.
1301 2ND AVE S, Minneapolis
remodel existing employee dining area and tasting room on mezzanine level.
1301 2ND AVE S, Minneapolis
EXHIBIT HALL E HOOK UP TEMPORARY WATER LINE TO WASHING MACHINE 12/6/21 12NOON AND REMOVE 12/20/21
1301 2ND AVE S, Minneapolis
FOR EXHIBIT HALL C - INSTALL 3 TEMP ELEC WATER HEATERS 2 TEMP HAIR WASH STATIONS AND 1 TEMP LARGE SINK. REMOVED 9/28/21