Minneapolis, MN
Minneapolis, MN
78
15
$1,132,013
Relocate supply diffusers and add return grilles.
INTERIOR REMODEL OG SUITE 1700 (MAA) certificate of occupancy required: NO const type: I B occupancy: B 2020 MSBC occupant load: 13 sprinklered: YES 20% accessibility upgrades___FULLY_______ Tenant: BROADWAY WEST SPEC SUITE
ROUGH IN AND INSTALL 1 SINK AND 1 WATER HEATER #2000
ROUGH IN AND INSTALL 1 SINK AND 1 WATER HEATER Suite 1700
REPLACE 4 TON HEAT PUMP
remodel office suite 3900 - approx. 1700 sq ft. sck certificate of occupancy required: no ***** const type: 2b ***occupancy: b ***2020 MSBC***** sprinklered: yes ***** Floor(s):3rd ***** architect: schmdit
Adding one heat pump and duct and diffuser modifications to accommodate new lay-out. refer to attached drawings.
FOR SUITE 6000 BREAKROOM: ROUGH IN AND INSTALL SINK, POINT OF USE WATER HEATER, HOOK UP DISHWASHER AND WATER LINE FOR COFFEE
Tenant Remodel - Suite 6000 certificate of occupancy required: no ***** special inspections required: no***** occupancy: B ***2015 MSBC***** sprinklered: yes ***** Tenant: Sunbelt ***Floor(s): 6 ***** sac: 2.65 charges ***2.9
WORK ON BASEMENT, 1,2,3,5,6. MAJORITY OF WORK IS FINISHES. NO STRUCTURAL WORK. AT LEVEL 1 SOUTH END, REMOVING SOME NON LOAD BEARING WALLS. OPENING UP SPACE FOR STORE. REPLACING DOOR ON CONVIENT STORE WITH FIRE RATED DOOR. (JJL ) certificate of occupancy r
Adding 7 transfer duct (return) , two new supply air, changing the flex duct passing through extended wall to a ridged duct and relocating one thermostat .
Non-structural TI 5th floor. B occupancy. 130 occupants Type II-B fully sprinkled. Tenant space fully accessible. Lic Interior Designer Ransom #00674
New duct work with 23 supply diffuser for remodeling space.
non-structural un-rated interior partitions and doors. architect Koster #44121
FIXTURES FOR #400/G2 PLANET BREAKROOM REMODELING INCLUDING CORE DRILL
G2Planet Tenant Improvement certificate of occupancy required: no ********** special inspections required: no********** const type: IIA occupancy: B 2015 MSBC************** occupant load: 217 ********** sprinklered: yes *****
Just changing the cooling tower with 400 ton capacity (1000 GPM).
misc. dampers , fitting, and diffusers along with relocating 4 t stat. Plan submitted and attached.
suite # 1950 break sink elec water heater dishwasher coffee fridge water line
suite # 1950 break sink elec water heater dishwasher coffee fridge water line
(DMH#1) 1,784sq.ft TENANT REMODEL TO SUITE 1500. INSTALL PARTITION WALLS FOR SMALL OFFICES AND CONFERENCE ROOM. NO CHANGE IN EXIT OR COORIDOR. Const type: II-B Occupancy: B 2015 MSBC Tenant space occupant load: 18 (Archit calc.)
(DMH#1) 1,976sq.ft TENANT REMODEL TO SUITE 1950. INSTALL PARTITION WALLS FOR SMALL OFFICE AND CONFERENCE ROOM. NO CHANGE IN EXIT OR COORIDOR. Const type: II-B Occupancy: B 2015 MSBC Tenant space occupant load: 20 (Archit calc.)
DEMO INTERIOR OFFICE WALLS. NON STRUCTURAL WALLS, MISC. INSTALLING SOME INTERIOR OFFICE WINDOWS. (JJL) PLANFORCE ARCHITECTURE.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.