Saint Cloud, MN
Saint Cloud, MN
73
2
Change of use from single-family dwelling to assisted living facility. No construction work completed under this permit.
Adding (1) receptacle
Wire Detached Garage
Wire a new furnace
to radon system
We redid the roof on our family room and now have a vaulted ceiling. The electrical scope of work is running new wiring to extend lighting switch legs to reach new lighting boxes on the ceiling. Also adding a fan rated box for ceiling fan. Moved receptacle over 2 ft.
Park addition project- connection of city water services and reinstall meter
Main floor bath remodel - Replace existing tub & surround for new tub & surround - No layout changes. Licensed plumber to replace fixtures in wet area only. If wet area is on ext wall - Will check for proper insulation & V. barrier prior to new acrylic panels installed
Main floor bath - Replace shower drain and rough in valve/trim kit
replace water line service LSL
Tear off and replace roof of dwelling
HOME REMODEL
Run Power to New Shed
Disconnection and reconnection of electrical services done by Xcel Energy. Lowering of mast (apprx. 18 inches) below new roof line by home owner. In relation to Building Permit RBLD25-0142.
REMOVE EXISTING FLAT ROOF ADD PITCHED ROOF. Install new Rafter/beams and plywood. Re- roof.
REMODEL 4 FIXTURES
Interior remodel of adjacent tenant space to create a larger tenant space for Kramer Financial. New area consists of a private office with private bathroom and conference room.
replacement furnace
replacement furnace
Furnace install (25-112)
Furnace install (25-112)
REPLACE 5 WINDOWS AND 1 DOOR
Furnace install (24-861)
Furnace install (24-861)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.