1216 SW 2 ST, Rochester
MAYO - FRANCIS BUILDING - 2T-5: LABORATORY - NEW EQUIPMENT STORAGE ROOM - WO 373813 R9146 THIS WORK IS T&M
1216 SW 2 ST, Rochester
Controls install for Nasseff Tower HPS Radiology Phase 3
1216 SW 2 ST, Rochester
Remove existing supply, and return air duct and replace with a new fan coil, 2 new fire smoke dampers and wall mounted grills. Mayo work order 374005, Mary Brigh 2-625 Harris Job #56602-75-5080
1216 SW 2 ST, Rochester
Controls Install for Mary Brigh AHU-S7
1216 SW 2 ST, Rochester
Repair/replace storm drains for Mary Brigh Emeregency department. (St Marys Campus-Mary Brigh / ROMB20C0040)
1216 SW 2 ST, Rochester
Conversion of a library to a resident room. (St Marys Campus - Nasseff Tower/ R9099)
1216 SW 2 ST, Rochester
New equipment room. (St Marys Campus - Francis / R9146)
1216 SW 2 ST, Rochester
Mechanical work associated with installation of 10 VAVs on MS Medical Sciences Building Energy Conservation ROMS19C0010 - - Med Sci Energy Harris Job# 56626-5080
1216 SW 2 ST, Rochester
Mechanical work associated with Mary Brigh MB 1-648 multiple room remodel Mayo Number R8369 : WO # 361810 Harris Job #56560-66
1216 SW 2 ST, Rochester
Mechanical work associated with Nasseth Tower 3rd floor 1219 2nd St SW. Mayo Number R9219 : WO # 375173 Harris Job #56602-93
1216 SW 2 ST, Rochester
Mechanical work associated with adding linear diffusers next to exterior windows in 6 locations on the 3rd floor of Nasseth Tower. Work Order#375018, Mayo # R9207 Harris Job #56602-86-5080
1216 SW 2 ST, Rochester
Provide new drain lines for new fire suppression system. (St Marys Campus - Mary Brigh / ROMB20E0020) Harris Job# 56639-5080
1216 SW 2 ST, Rochester
Provide demolition and removal of the existing AHU S-7 and replace it with a new make and model. Provide new mains for install and prepare space below for future. (St Marys Campus - Mary Brigh 7 / ROMB20C0010) Harris Job #56642-5080
1216 SW 2 ST, Rochester
7R150710 Temperature Controls
1216 SW 2 ST, Rochester
Mayo Project 7R150710 Francis Kitchen Exhaust Hood Upgrade, per plans dated 08/23/2021 by Michaud-Cooley-Erickson Engineering Solutions. Replace existing type II exhaust hood with a type I grease exhaust hood in the Francis Main Kitchen. Also, demo existing galvanized duct, fabricate and install new 16 gauge black iron welded grease duct in the same location as the duct being removed. New grease duct to have fire wrap insulation installed by another Company Mayo is hiring direct. Fire Suppression system to be included with the new type I hood package.
1216 SW 2 ST, Rochester
Remove one surgical scrub sink of 2. Repipe DCW, DHW on the remaining scrub sink to include foot pedal, 1070 mixing valve and new gooseneck
1216 SW 2 ST, Rochester
Remove one of 2 scrub sinks, on remaining scrub sink install foot pedal, 1070 mixing valve and gooseneck
1216 SW 2 ST, Rochester
Remove one of 2 surgical scrub sinks. On remaining scrub sink install new foot pedal, 1070 mixing valve and gooseneck
1216 SW 2 ST, Rochester
Remove one of 2 scrub sinks. Install new foot pedal, 1070 mixing valve and gooseneck
1216 SW 2 ST, Rochester
Repair and replace leaking section of LPC piping
1216 SW 2 ST, Rochester
Repair 1” DHWR riser leak
1216 SW 2 ST, Rochester
Install new copper water distribution piping to existing fixtures. Install new instantaneous water heaters (2). Demo existing galv piping
1216 SW 2 ST, Rochester
Replace hot water heating control valve
1216 SW 2 ST, Rochester
Repair 2 1/2” Hot Water Heating victaulic leak
1216 SW 2 ST, Rochester
Repair 3/4” DHWR line