Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
Replace DCW ball valve has leak on upstream side
1216 SW 2 ST, Rochester
LP steam and condensate left open and abandoned in wall. cap or plug piping
1216 SW 2 ST, Rochester
Install DW&V, water, drain box for ice/water dispenser
1216 SW 2 ST, Rochester
Patient room shower needs upgrade, install new linear drain, DW&V, water piping, shower valve, toilet and lav
1216 SW 2 ST, Rochester
Replace end of main trap on LP steam
1216 SW 2 ST, Rochester
NH waste piping has boils on it replace multiple pipes
1216 SW 2 ST, Rochester
NH waste piping from shower has crack , replace
1216 SW 2 ST, Rochester
Niron water pipe leak on MB-3
1216 SW 2 ST, Rochester
Space is getting new countertop, replace sink and faucet also
1216 SW 2 ST, Rochester
Repair chilled water leak
1216 SW 2 ST, Rochester
Hot water heat control valve is leaking, replace
1216 SW 2 ST, Rochester
Install new sink and faucet in conference room
1216 SW 2 ST, Rochester
2" DCW 90s are leaking replace
1216 SW 2 ST, Rochester
Fr 7 dietary getting new countertop, replace existing sink, faucet, strainer, insta hot water maker
1216 SW 2 ST, Rochester
New gas cook top needs install. hook up gas with new dormont flex gas hose, and restraints
1216 SW 2 ST, Rochester
2 rooms need hot water heat install at new vavs
1216 SW 2 ST, Rochester
AHUs 34, 34, 36, 37 need new shutoff valves on 6" chilled water
1216 SW 2 ST, Rochester
Steam trap is plugged, replace TLV trap
1216 SW 2 ST, Rochester
Install insta hot water maker at existing sink
1216 SW 2 ST, Rochester
Install glycol reservoir with pump to glycol heating tube bundle
1216 SW 2 ST, Rochester
Space needs 2 steam FCUs installed
1216 SW 2 ST, Rochester
M0059290 Relocate Pyxis/ Add Workstations Justin Bernard
1216 SW 2 ST, Rochester
FURNISH AND INSTALL MECHANICAL DUCTWORK, VAV, GRD, FAN COIL, DAMPERS
1216 SW 2 ST, Rochester
James Kelly/ROMB22C0060/ MB Procedure Room Remodel 105 Cardiac Cath Lab 4-664/Remodel space to allow for updating outdated equipment in Cardiac Cath Procedure Room #105. This project is last phase of planned update of multiple rooms (102, 104, 107, & 108). Equipment is already 3 years beyond typical life span and remodel will resolve identified infection control issue.
1216 SW 2 ST, Rochester
-Mary Brigh 4 -Remodel Cath lab
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.