Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
PLUMBING - Raise ceiling to accomodate vent hood in lab(bldg code), close wall opening between THIS ROOM & 4-403. SMH - ALFRED 4-407A LABORATORY
1216 SW 2 ST, Rochester
Alterations for the ETO Sterilizer replacement. (St. Mary's Mary Brigh - Mayo Project 7R071800)
1216 SW 2 ST, Rochester
Alterations for Assessment Room Fit-up. (St. Mary's Joseph 1-207 - Mayo Project R3864 - Work Order 284997)
1216 SW 2 ST, Rochester
Electrical - Alterations for the ETO Sterilizer replacement. (St. Mary's Mary Brigh - Mayo Project 7R071800) PO 601819-4-910-E
1216 SW 2 ST, Rochester
PLUMBING - Need to intall booster pumps in order in insure proper water pressure for cleaning & sanitization. SMH - ALFRED 9-430A ANIMAL HOUSING
1216 SW 2 ST, Rochester
HYDRONIC - Old pneumatic temperature control SMH - ALFRED MN-439 OFFICE / WO286691
1216 SW 2 ST, Rochester
HYDRONIC - Modify/re-route chill water lines SMH - DOMITILLA 7-261 EQUIPMENT / WO286645
1216 SW 2 ST, Rochester
Mechanical - Ventilation per plans - Alterations for the ETO Sterilizer replacement. (St. Mary's Mary Brigh - Mayo Project 7R071800)
1216 SW 2 ST, Rochester
Mechanical - furnish and install Air Handling Units #1, #2, #3 and return Fans #1, #2, #3 for the Mary Brigh East Expansion Bldg - Fabricate and install portions of the new ductwork as required for coordination of elevations with all contractors. East Expansion Shell - Phase 1. (St. Mary's Mary Brigh - Mayo Project 7R080530 7R090760)
1216 SW 2 ST, Rochester
ELECTRICAL work for week ending 02/05/2010 SMH - ALFRED 407A REMODEL / WO285704
1216 SW 2 ST, Rochester
HVAC Infrastructure Upgrade. (St. Mary's Mary Brigh 3 - Mayo Project 7R081080)
1216 SW 2 ST, Rochester
PLUMBING - Modify the shower harware in the bathrooms SMH - GENEROSE 2-251 PATIENT ROOM-PRIVATE / WO286229
1216 SW 2 ST, Rochester
HYDRONIC - Install reheat coil in supply duct for FCU supplying SMH - Alfred MN-437 CORRIDOR / WO286313
1216 SW 2 ST, Rochester
HYDRONIC - Cut access & install lowers above the radiation SMH - FRANCIS MN-19ADM ADMINISTRATION
1216 SW 2 ST, Rochester
Electrical - Elevator retroactive code upgrades. (St. Mary's Marian Hall - Mayo Project 8R080210)
1216 SW 2 ST, Rochester
ELECTRICAL work for week ending 01/29/2010 SMH - MARY BRIGH 738B REMODEL / WO282725
1216 SW 2 ST, Rochester
Gas-Piping/Remove old equip & install (2) steam kettles, griddle oven & range oven in the MB patient try service. (SMH - MARY BRIGH, GR-710 KITCHEN / WO285534)
1216 SW 2 ST, Rochester
Plumbing - Remove old equip & install (2) steam kettles, griddle oven & range oven in the MB patient tray service. (SMH - MARY BRIGH, GR-710 KITCHEN / WO285534)
1216 SW 2 ST, Rochester
Hydronic - Replace controllers/HVAC will supply the valves to RPH for upgrade SMH - FRANCIS 3T-99 OFFICE / WO286207
1216 SW 2 ST, Rochester
Hydronic - Replace TAC radiation valves & traps (north side) SMH - JOSEPH, MN-72 OFFICE CLERICAL / WO286205
1216 SW 2 ST, Rochester
Plumbing - Need toilet repiped from supply shut off to toilet/to remove bed pan flusher SMH - MARY BRIGH, MN-585 TOILET / WO286250
1216 SW 2 ST, Rochester
Plumbing - Assess, locate, and repair wter main SMH - ALFRED, GR-433 EQUIPMENT ROOM / WO286235
1216 SW 2 ST, Rochester
Electrical work for week ending 01/20/2010 SMH - MARY BRIGH 603 REMODEL / WO284536
1216 SW 2 ST, Rochester
Electrical for HVAC Infrastructure Upgrade. (St. Mary's Mary Brigh 3 - Mayo Project 7R081080)
1216 SW 2 ST, Rochester
Mechanical - HVAC - HVAC Infrastructure Upgrade. (St. Mary's Mary Brigh 3 - Mayo Project 7R081080)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.