Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
Electrical work for week of 11/19/2010 SMH - FRANCIS GT-8 REMODEL / WO290146
1216 SW 2 ST, Rochester
Electrical work for week ending 11/19/2010 SMH - MARY BRIGH 725 REMODEL / WO290145
1216 SW 2 ST, Rochester
Plumbing - install utility sink in shop SMH - LAUNDRY MN-626 MAINTENANCE SHOP / WO291541
1216 SW 2 ST, Rochester
Plumbing - domestic cold wter gate valve leasks; replace, insulate, document & install valve tag (SMH - MARY BRIGH 2-503 OFFICE / WO291420)
1216 SW 2 ST, Rochester
Plumbing - add sink & patient call to meet safety standards/Long lead items SMH - JOSEPH 4-245 PROCEDURE-TREATMENT / WO290054
1216 SW 2 ST, Rochester
Plumbing - need minor remodeling to accommodate respirator fit testing & storage SMH - DOMITILLA 1-252G OFFICE / WO290659
1216 SW 2 ST, Rochester
Plumbing - 8" domestic water supply valve located 10 under street between Marian Hall & Alfred bldg is leaking & needs to be replaced. SMH - ALFRED MN-400 STAIRWAY/ WO291216
1216 SW 2 ST, Rochester
Plumbing - 2 floor drains/floor sinks are no longer operating properly; repl fixtures SMH - ALFRED GR-433 EQUIPMENT ROOM / WO290975
1216 SW 2 ST, Rochester
Hydronic - fan coils, blood donation are not handling the heat load for the space SMH - JOSEPH MN-86 PROCEDURE-TREATMENT / WO290684
1216 SW 2 ST, Rochester
Hydronic - 3" gate valve on low pressure condenste return line is leaking SMH - DOMITILLA GR-137 EQUIPMENT ROOM / WO291258
1216 NW 2 AVE, Rochester
Electrical (service panel replacement & 2nd floor outlets where extension cords were being used) - New 2 x 4 to existing rafters - redeck with ice/water and paper. Reroof Single Family Dwelling. adjoin new 2 x 4's to existing in lieu of replacement due to deterioration of existing.
1216 SW 2 ST, Rochester
ELECTRICAL work for week ending 11/05/2010 SMH - MARY BRIGH GR-505 REMODEL / WO290622
1216 SW 2 ST, Rochester
ELECTRICAL work for week ending 11/08/2010 SMH - DOMITILLA - TRENCH / WO291677
1216 SW 2 ST, Rochester
ELECTRICAL work for week ending 11/08/2010 SMH - MARY BRIGH - TRENCH / WO291676
1216 SW 2 ST, Rochester
Joseph Scan Room Remodel 6th level (St Mary's - Joseph Bldg - Proj#7R090580)
1216 SW 2 ST, Rochester
Electrical - Joseph Scan Room Remodel 6th level (St Mary's - Joseph Bldg - Proj#7R090580)
1216 SW 2 ST, Rochester
Hydronic (extend hot water heating lines from existing mains to new re-heat coil) - Joseph Scan Room Remodel 6th level (St Mary's - Joseph Bldg - Proj#7R090580)
1216 SW 2 ST, Rochester
Plumbing - Joseph Scan Room Remodel 6th level (St Mary's - Joseph Bldg - Proj#7R090580)
1216 SW 2 ST, Rochester
HYDRONIC - Add another steam condensate receiver or pressure trap system SMH - MARY BRIGH SG-759 EQUIPMENT ROOM PRIMARY
1216 SW 2 ST, Rochester
PLUMBING - need sediment filter installed in laundry room before washer SMH - CONVENT MN-189 LAUNDRY FACILITIES / WO290849
1216 SW 2 ST, Rochester
PLUMBING - install shower valve & shower head SMH - GENEROSE 2-251 PATIENT ROOM - PRIVATE / WO291140
1216 SW 2 ST, Rochester
Andover Control System for Joseph Scan Room Remodel 6th level (St Mary's - Joseph Bldg - Proj#7R090580)
1216 SW 2 ST, Rochester
MECHANICAL/HVAC - ductwork, demo, grd, & vav for the scan room remodel (SMH - JOSEPH 6TH, Proj#7R090580)
1216 SW 2 ST, Rochester
ELECTRICAL work for the week ending 10/29/10 SMH - FRANCIS GT-8 REMODEL / WO290146
1216 SW 2 ST, Rochester
ELECTRICAL work for week ending 10/29/10 SMH - MARY BRIGH 725 REMODEL / WO290145
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.