Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
Hydronic (pipe VAV) - Alterations to existing department of psychiatry phase 1A (St Mary's - Generose - Main - 7R121491)
1216 SW 2 ST, Rochester
Alterations to existing department of psychiatry phase 1A (St Mary's - Generose - Main - 7R121491)
1216 SW 2 ST, Rochester
Hydronic Systems - install valves on the chilled water lines serving MBS 36 & 37 SMH - Mary Brigh 09-502 Equipment Room Primary, WO317297
1216 SW 2 ST, Rochester
Hydronic Systems - install a new heater unit on level 9 of MB Stair 1 SMH - Mary Brigh 08-501 Stairway, WO316777
1216 SW 2 ST, Rochester
Plumbing - repipe roof drain & overflow & label above new public restrooms (502) also located in main entrace lobby south side. SMH - Mary Brigh MN-502 Toilet, WO317413
1216 SW 2 ST, Rochester
Plumbing - floor drain piping cracked leaking bad 10 section leel 1 middle west side, new pipe & bands. SMH - Mary Brigh GR-111 Parking Ramp, WO317416
1216 SW 2 ST, Rochester
Plumbing - clean sink install SMH - Francis 2T-13 Procedure/Treatment, WO314720
1216 SW 2 ST, Rochester
Plumbing - remove broken concrete pad around top of drain pipe from 5th floor deck SMH - Generose Parking Ramp 04-100 Stairway, WO317552
1216 SW 2 ST, Rochester
Plumbing -main east renocations to accommadate secretary move SMH - Generose MN-236 Office, WO317723
1216 SW 2 ST, Rochester
Plumbing -need 2 actuators installed on the domestic hot water heat exhchanger SMH - Mary Brigh GR-800 Equipment Room Primary, WO317510
1216 SW 2 ST, Rochester
Electrical - Alterations to existing department of psychiatry phase 1A (St Mary's - Generose - Main - 7R121491) PO 603068-1-910E
1216 SW 2 ST, Rochester
Mechanical (ventilation modifications) - Alterations to existing department of psychiatry phase 1A (St Mary's - Generose - Main - 7R121491)
1216 SW 2 ST, Rochester
Electrical (low voltage electrical install) - Alterations to existing department of psychiatry phase 1A (St Mary's - Generose - Main - 7R121491)
1216 SW 2 ST, Rochester
Electrical work done for the week ending 03/22/2014 SMH - Generose GR-EWC3S REM, WO317586
1216 NW 33 ST, Rochester
Mechanical - furnace replacement
1216 SW 2 ST, Rochester
Hydronic - replace chilled water supply & return valves for FS2 SMH - Francis BA-15 Equipment Room, WO317001
1216 SW 2 ST, Rochester
Plumbing - wall flooded water supply bad & stop not working for public bathroom SMH - Generose 01-103 Toilet, WO316963
1216 SW 2 ST, Rochester
Plumbing - hot water heating line leaking Vic Joint leaking in PT room; PT has been moved SMH - Mary Brigh 06-730 Patient Room-Private, WO317014
1216 SW 2 ST, Rochester
Plumbing - emergency eye wash upgrade SMH - Mary Brigh 01-617, WO317217
1216 SW 2 ST, Rochester
Plumbing - 2" Dom. pumped cold water line leaking 3th floor, room 718 will need shutdown SMH - Mary Brigh 04-718 Sleep Quarters, WO317040
1216 SW 2 ST, Rochester
Plumbing - RPH-3" sewer waste leaking & has cracked will need replacing evening project SMH - Mary Brigh MN-500 Electrical Room Primary, WO316895
1216 SW 2 ST, Rochester
Plumbing - RPH-Himec need new steam heating fin tube installed in entry of laundry bldg SMH - Laundry MN-602 Office Reception, WO316704
1216 SW 2 ST, Rochester
Hydronic - Install new heating line SMH - Mary Brigh GR-870A Equipment room Primary, WO316924
1216 SW 2 ST, Rochester
Plumbing - preheat valve is leaking; new valve is in & needs to be installed SMH - Joseph 07-195 Electrical Room Primary, WO316861
1216 SW 2 ST, Rochester
Plumbing - assist SMH-SPL with our campus wide steam trap program SMH - Marian Hall MN-516 Office Clerical, WO316876
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.