Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
MAYO - FRANCIS BUILDING-03-116 AND 129: PLAYROOM - ELECTRICAL WORK FOR PLAYROOM UPGRADES - MAYO PROJECT #7R180030 ADAIR JOB# 15581
1216 SW 2 ST, Rochester
-MAYO- LAUNDRY BUILDING-GR-T10: CORRIDOR - ELECTRICAL WORK TO REPLACE VFD - WO 375326 THIS WO IS T&M
1216 SW 2 ST, Rochester
Remodel of Room 2-157 Mary Brigh Playroom Ventilation modifications remove existing VAV boxes, furnish and install new VAV boxes and distribution duct work per plans issued.
1216 SW 2 ST, Rochester
MAYO - MARY BRIGH BUILDING-4-512: CLASSROOM - ELECTRICAL WORK TO REMODEL CVIS PROGRAM SPACE - MAYO WO 0003118 ADAIR WO W0296 THIS WORK IS T&M MAYO - MARY BRIGH BUILDING-MAIN-620A - ELECTRICAL WORK FOR CARDIOGRAPHY STUDY EQUIPMENT - MAYO WO 0003951 ADAIR WOW0303 THIS WORK IS T&M
1216 SW 2 ST, Rochester
MAYO - ALFRED BUILDING-MAIN-449B: OFFICE - ELECTRICAL WORK TO COMBINE ROOMS 449B AND 449C - MAYO WO 0005312 ADAIR WO W0400 THIS WORK IS T&M
1216 SW 2 ST, Rochester
MAYO - GENEROSE BUILDING-GROUND FLOOR - ELECTRICAL WORK FOR PREHEAT PUMPS - MAYO PROJECT ROGE22E0010 ADAIR JOB #16052
1216 SW 2 ST, Rochester
RONT21C0010 NT Nasseff Tower Kitchen Remodel: Reconfigure the layout of the tray lines in the Nasseff Tower kitchen to allow for better efficiencies and increased capacities
1216 SW 2 ST, Rochester
7r180030/Steve Rasmusson/Upgrade teen & family lounge room 2-157.
1216 SW 2 ST, Rochester
MAYO - MARY BRIGH BUILDING-07-BG - ELECTRICAL WORK FOR PATIENT LIFT INSTALLATION - MAYO PROJECT# ROMB10C0060 ADAIR JOB# 16037
1216 SW 2 ST, Rochester
MAYO - FRANCIS BUILDING- 3RD FLOOR - ELECTRICAL WORK FOR HUGS SYSTEM - MAYO PROJECT# 7R180890 ADAIR JOB #16053
1216 SW 2 ST, Rochester
Replace automated Bray isolation valve on hot water heat system and also change out 2 LP steam valves
1216 SW 2 ST, Rochester
Repair cold water piping attached to outside hose bib. Leaking in building.
1216 SW 2 ST, Rochester
Repair DHW line due to leak
1216 SW 2 ST, Rochester
Remove leaking dialectric unions on radiant heat system
1216 SW 2 ST, Rochester
Repair DHWR line in PP tunnel and replace old leaking isolation gate valve in Convent
1216 SW 2 ST, Rochester
Remove leaking dialectric unions on radiant heat system.
1216 SW 2 ST, Rochester
Mary Brigh roof replacement. Replace all roof drains and overflows on all Mary Brigh roofs
1216 SW 2 ST, Rochester
FCU has low flow, flush coil. Add longer dirt legs for maintenance to blow down periodically. T&M
1216 SW 2 ST, Rochester
Repair LP steam piping. Remove Megapress fitting and thread system back together T&M
1216 SW 2 ST, Rochester
Install 2” blow down to drain on chilled water. Install DP across supply and return piping. Install drain valves on FCU per Mayo spec T&M
1216 SW 2 ST, Rochester
Repair 3” DHW leak in GE building, T&M
1216 SW 2 ST, Rochester
Install new chilled water pump, piping, DP and control valves for new Magneto Cardioghraph
1216 SW 2 ST, Rochester
Install new DWV, DHW, DCW to new surgical scrub sink, 1070 mixing valve and foot pedal for new cardio classroom
1216 SW 2 ST, Rochester
R9103/Steve Rasmusson Classroom Remodel MN-RO-MB-04-512
1216 SE 9 AVE, Rochester
REPLACE WATER HEATER
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.