Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
4" DCSW cross tie valve to DCW has broken stem in off position needs replacement
1216 SW 2 ST, Rochester
Install new VAV and valves and control valves, piping
1216 SW 2 ST, Rochester
Replace steam FCU, valves, steam trap and control valve
1216 SW 2 ST, Rochester
3" LP steam condensate is leaking, repair
1216 SW 2 ST, Rochester
Chilled water to FCU has hole in piping
1216 SW 2 ST, Rochester
Pipe drain lines off new hot wells to floor sink with air gap
1216 SW 2 ST, Rochester
Replace steam fin tube, valves, control valve and trap
1216 SW 2 ST, Rochester
6" storm pipe was hit by vehicle in ramp, needs replacement
1216 SW 2 ST, Rochester
Install new water piping, DW&V, fixtures to existing mens bathroom space
1216 SW 2 ST, Rochester
Replace water piping, DW&V, fixtures in womens restroom
1216 SW 2 ST, Rochester
Remodel shower space to convert shower to anti ligature shower valve and break away shower wand
1216 SW 2 ST, Rochester
Install DW&V standpipe and water for new espresso machine
1216 SW 2 ST, Rochester
Relocate rosemount control on chilled water piping
1216 SW 2 ST, Rochester
Replace steel fin tube, ball valves, control valve and steam trap
1216 SW 2 ST, Rochester
ROXX23E0140/Kelly Merrick Francis Bid Set 10 - Conference rooms across the enterprise need critical updates to support hybrid meetings and provide an equitable experience for remote meeting attendees.
1216 NW 2 ST, Rochester
Window replacements - Remove and discard storms. Outside installs with weight pockets. Wrap out in white. (Rental)
1216 SW 2 ST, Rochester
Mechanical work associated with Adding New fan-coil unit and GRD's - Mayo # 65348 - Joseph 1-237 Harris Job #Y080025288-N5080
1216 SW 2 ST, Rochester
Refresh of care unit.
1216 SW 2 ST, Rochester
Mayo - St. Mary's Building - Cath Lab 105 - Electrical work for cath lab 105 remodel - Mayo Project ROMB22C0060 Adair Job 17301
1216 SW 2 ST, Rochester
Mayo-Mary Brigh Building-Main Floor-543 -Electrical work for conference rooms -Mayo project number ROXX23E0140 Adair project number 17591 -This work is T&M
1216 SW 2 ST, Rochester
Mayo-St Marys Power Plant -Electrical work to replace the fire pump and the associated automatic transfer switch -Mayo project number ROPP24C0010 Adair project number 17648
1216 NW 2 ST, Rochester
Window and door replacement - Outside install with weight pockets. Wrap out in white - wrap exterior back to siding and tuck under crown on top. Upper bedroom and upper master casement windows will be tight. Windows ordered 1/4" wider than measured due to need to meet egress code. Back entry - standard door install. 2x10 treated provided for sill. 4-1/2" flat white casing in (ordered with door). Bright brass accent lever and DB ordered with door. Wrap out in white. New storm door being installed. | Other
1216 SW 2 ST, Rochester
ANNUAL PLUMBING PERMIT FOR GENEROSE BUILDING MAYO MAINTENANCE
1216 SW 2 ST, Rochester
ANNUAL PLUMBING PERMIT FOR JOSEPH, ALFRED, DOMITILLA, FRANCIS BUILDINGS MAYO MAINTENANCE
1216 SW 2 ST, Rochester
ANNUAL PLUMBING PERMIT FOR MARY BRIGH & NASSIF BUILDING MAYO MAINTENANCE
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.