Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
MAYO - GENEROSE GR: 203 EQUIPMENT ROOM PRIMARY - REPLACE EXISTING GHWS & CHWR VALVES TO AHU GS 1 & 2 (4) VALVES WO: 373136 / 5921-96
1216 SW 2 ST, Rochester
MAYO - GENEROSE 02:398 OFFICE - REPLACE LEAKING CONTROL VALVE ON HOT WATER HEATING WO: 373145 / 5921-94
1216 SW 2 ST, Rochester
MAYO - MARY BRIGH 09: 502 EQUIPMENT ROOM PRIMARY - REPLACE STORM DRAINAGE INTERCEPTOR FROM HELIPAD WITH STAINLESS STEEL INTERCEPTOR WO: 372066 / 5921-93
1216 SW 2 ST, Rochester
MAYO - EAST TOWER GR: 850 KITCHEN - INSTALL CW TO DIVERSY FRUIT & VEGETABLE WASHER WO: 372965 / 5921-88
1216 SW 2 ST, Rochester
MAYO - ST MARYS POWER PLANT OL: 112A OFFICE - REPAIR LP COND LEAKING PIPE WO: 373013 / 5921-87
1216 SW 2 ST, Rochester
MAYO - EAST TOWER 03 - REWORK EXISTING RADIANT PANEL FOR WINDOW ICING PROBLEMS WO: 372593 / 5921-57
1216 SW 2 ST, Rochester
Facilities Operation Inventory Management System. Remodel for relocation of Mayo's inventory storage system in the Alfred Building. (Alfred / 7R170670)
1216 SW 2 ST, Rochester
Facilities Operations Inventory Management System, remodel for relocation of Mayo's inventory system storage in the Mayo Building. (Mayo / 7R170690)
1216 SW 2 ST, Rochester
Facilities Operation Inventory Management System. Remodel for relocation of Mayo's inventory storage system in the Alfred Building. Egan job# 609717-910
1216 SW 2 ST, Rochester
Temp Controls 7R100582
1216 SW 2 ST, Rochester
Temp Controls 7R170750
1216 SW 2 ST, Rochester
Mayo Mary Brigh Building - 1st Floor - Project #ROMB19C0010 Plumbing alterations for Tissue Lab remodel
1216 SW 2 ST, Rochester
Mayo Mary Brigh Building - 1st Floor - #ROMB19C0010 Hot water Heating alterations for Lab remodel
1216 SW 2 ST, Rochester
MAYO - GENEROSE 01:267 PATIENT ROOM - REPLACE EXISTING VAV COIL, RECONNECT PIPING WO: 372770 / 5921-74
1216 SW 2 ST, Rochester
Alteration to the frozen section lab. (St Marys Campus - Mary Brigh / ROMB19C0010)
1216 SW 2 ST, Rochester
Mechanical work associated with the alteration to the frozen section lab. (St Marys Campus - Mary Brigh / ROMB19C0010). Harris Job#56601-5080
1216 SW 2 ST, Rochester
Electrical work for a renovation of the Frozen Section Lab Egan foreman Joe Kremer 507-440-4759 Egan job# 610017-910
1216 SW 2 ST, Rochester
Plumbing work associated with the remodel of existing Mary Brigh Main Reading Room. St. Marys Campus – Mary Brigh – ROMB19C0010 Harris Job# 56563-5080
1216 SW 2 ST, Rochester
Mechanical work associated with the remodel of existing Mary Brigh Main Reading Room. St. Marys Campus – Mary Brigh – ROMB19C0010 Harris Job# 56563-5080
1216 SW 2 ST, Rochester
Generose 3rd Floor Safety Updates BAS controls install
1216 SW 2 ST, Rochester
Generose Safety Upgrades BAS controls install
1216 SW 2 ST, Rochester
MAYO - MARIAN HALL-04-500:OFFICE - CREATE MULTI-STALL LACTATION SPACE - WO 370934 R8944 THIS WORK IS T&M
1216 SW 2 ST, Rochester
Temp controls for Fr 3 PEDIATRIC UNIT PLAYROOMS TEEN LOUNGE
1216 SW 2 ST, Rochester
MAYO - FRANCIS BUILDING-3-116 & 129 - REMODEL PEDIATRIC PLAYROOMS - MAYO PROJECT # 7R180030 ADAIR PROJECT #15581
1216 SW 2 ST, Rochester
Relocate sinks for playroom remodel Francis Building-3rd Floor-Mayo Project #7R180030