Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
Electrical work for Mayo# ROMB21C0060 110 Heart Rhythm remodel of room Egan foreman: Eric Binner 507-251-3597 Egan Job# 611510-910
1216 SW 2 ST, Rochester
Electrical work for Mayo# ROMB21C0060 112 Heart Rhythm remodel of room Egan foreman: Eric Binner 507-251-3597 Egan Job# 611509-910
1216 SW 2 ST, Rochester
MAYO CLINIC -FRANCIS BUILDING - GROUND FLOOR 36: DIETARY FREEZER ELECTRICAL WORK FOR FREEZER REPLACEMENT MAYO WO 0007949 ADAIR WO W2558
1216 SW 2 ST, Rochester
MAYO CLINIC-MARY BRIGH BUILDING-5TH FLOOR-545 ELECTRICAL WORK TO REMODEL STOCK ROOM MAYO WO 0008931 ADAIR WO W2556
1216 SW 2 ST, Rochester
ROXX21C0070 Creating control rooms for oxidizing gases to meet the MAQ requirements. Phase I includes Mary Brigh and one set of doors at Alfred.
1216 SW 2 ST, Rochester
Electrical work for Remodel of Angio Room 4 in Nasseff Tower main level- Mayo# ROET22C0010 Egan foreman: Eric Binner 507-251-3597 Egan job# 611382-910
1216 SW 2 ST, Rochester
4” Galv sanitary sewer has leak at threads. Replace with NH
1216 SW 2 ST, Rochester
LP Steam leak from mega press, repipe a portion of steam and condensate. Both have mega press
1216 SW 2 ST, Rochester
Existing storm piping showing signs of leaks at nh bands or poor insulation job. Investigate staining of insulation and replace piping and or bands
1216 SW 2 ST, Rochester
Existing 4” glycol piping showing signs of leaking at Vic clamps near heat exchanger. Drain system and replace Vic clamps and fittings as needed
1216 SW 2 ST, Rochester
Replace 3” wafer check valve on DHW system with Stainless steel NSF-61 rated check valve
1216 SW 2 ST, Rochester
Existing .33 flow restrictor is leaking on DHWR. Replace with Stainless steel IMI .33 flow restrictor, check valve.
1216 SW 2 ST, Rochester
Replace gasket on Glycol Heat exchanger 29
1216 SW 2 ST, Rochester
Replace existing FCU along with new control valve and misc piping
1216 SW 2 ST, Rochester
Replace pot and scullery sink in MB dishwasher room. Is missing leg.
1216 SW 2 ST, Rochester
Remove existing island vented sink and install a new hand sink, DCW, DHW, DHWR in remodeled location
1216 SW 2 ST, Rochester
ROET22C0010 - Ryan Taylor Remodel of Angio Room 4 in Nasseff Tower main level
1216 SW 2 ST, Rochester
Install new DW&V and DCW, DHW for new sink in new lactation room
1216 SW 2 ST, Rochester
Mechanical work associated with providing new HVAC systems for a temporary pharmacy on Generose 5th floor. This includes new exhaust fans, new vavs and HEPA Diffusers for the pharmacy setup. Mayo # ROMB19C0051- Generose Compound Pharmacy Harris Job # 56794 – 02 – 5080
1216 SW 2 ST, Rochester
Remodel floor to create a temporary pharmacy. Job #223010
1216 SW 2 ST, Rochester
ROMB19C0051/Kelly Merrick - The Minnesota Board of Pharmacy has noted deficiencies in the existing facilities that will be cited after required updates become enforceable in December 2019 with the release of the updated USP 797. Updates include replacement of sliding pass through windows and covered flooring, and installing low returns.
1216 SW 2 ST, Rochester
Mayo Francis Building-Staff Kitchen-Project ROFR21C0010 Add 7 grease traps and revise piping to separate grease waste
1216 SW 2 ST, Rochester
0013611/Steve Rasmusson New Department Lactation Room - Mary Brigh 1st floor
1216 SW 2 ST, Rochester
Mechanical work associated with adding a VAV box and duct to an office space, Mayo # 13611 T&M work order Harris Job # 56742-83-5080
1216 SW 2 ST, Rochester
Controls installation for Domitila Cart wash project
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.