1216 SW 2 ST, Rochester
Mayo Clinic - Mary Brigh Building 5-558 Electrical work for sound proofing wall Mayo WO 0012320 Adair WO W3673 This work is T&M
1216 SW 2 ST, Rochester
Mayo Francis Building-Main Floor-Project#ROXX22E0140 Revise hydronic heating for remodeled cafe commons
1216 SW 2 ST, Rochester
Mayo Francis Building-Main Floor- Project ROFR21C0030 Remodel Visitor Cafe
1216 NW 33 ST, Rochester
VENT AND HANG NEW RANGE HOOD
1216 SW 2 ST, Rochester
Mary Brigh Building 4th Floor- Project #ROMB21C0040 Revise plumbing for remodeled procedure room
1216 SW 2 ST, Rochester
Mary Brigh Building 4th Floor- Project #ROMB21C0040 Revise hydronic piping for remodeled procedure room
1216 SW 2 ST, Rochester
Mary Brigh 4th Floor-Project #ROMB21C0080 Revise plumbing for remodeled procedure room
1216 SW 2 ST, Rochester
Mary Brigh 4th Floor-Project #ROMB21C0080 Revise hydronic piping for remodeled procedure room
1216 SW 2 ST, Rochester
Install new outside freeze less wall hydrant
1216 SW 2 ST, Rochester
Remove mega press fitting on LP steam
1216 SW 2 ST, Rochester
MAYO - SERVICE BUILDING - ROOF ELECTRICAL WORK TO REPAIR EXHAUST FANS MAYO WO 0027355 ADAIR WO W2793
1216 SW 2 ST, Rochester
Mayo- Generose Building - Ground floor Electrical work for GE - Recirc Hot water heaters Mayo WO 0032928 Adair WO W3251
1216 SW 2 ST, Rochester
Mayo Clinic - Joseph Building 6-183E Electrical work to add 220 power for 3D printer Mayo WO 0007705 Adair WO W3303 This work is T&M
1216 SW 2 ST, Rochester
Mayo - Generose Building 4-363 Electrical work to redesign staff breakroom Mayo WO 0020921 Adair WO W3356 This work is T&M
1216 SW 2 ST, Rochester
Mayo - Mary Brigh Building - GR-531 Electrical work to remove wall Mayo WO 0018791 Adair WO W3142 This work is T&M
1216 SW 2 ST, Rochester
Mayo - Francis Building - Basement-20E Electrical work to install jockey pump Mayo WO 0027234 Adair WO W2788 This work is T&M
1216 SW 2 ST, Rochester
Mayo- Domitilla Building - 5-263A Electrical work to meet code requirements for duct Mayo WO 0000222 Adair WO W3403 This work is T&M
1216 SW 2 ST, Rochester
Mayo - Francis Building - 4-T2 Electrical work to accommodate desks Mayo WO 0019779 Adair WO W3392 This work is T&M
1216 SW 2 ST, Rochester
Mayo - St. Mary's Chapel - 1-162 Electrical work for new LED lights Mayo WO 0012726 Adair WO W2729
1216 SW 2 ST, Rochester
Mayo - Alfred Building - 2-449 Electrical work to install Roche Cobas C501 Mayo WO 0013413 Adair WO W1405
1216 SW 2 ST, Rochester
Repair LPS leak on humidifier bar due to O ring failure
1216 SW 2 ST, Rochester
Repair DHWR leak
1216 SW 2 ST, Rochester
Toilet had leak behind wall on concealed flushometer and toilet had plates stacked underneath. Lower carrier, reinstall toilet with new flushometer
1216 SW 2 ST, Rochester
Current non potable piping on sterilizers hammers and fails RPZs. Also install separate backflow for each sterilizer to bring up to code Relocate RPZs to 2 mech and install Blacoh hammer arrestors
1216 SW 2 ST, Rochester
Install new Drinking Fountain with bottle filler style. Change rough in to make change