Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
M0050116 Justin Bernard Office refresh to include updates of: wallpaper, flooring, cabinets/storage and furniture layout.
1216 SW 2 ST, Rochester
Multiple mega press fittings on LP steam need to be removed
1216 SW 2 ST, Rochester
AHU MBS 10 needs condensate piping and pan redone
1216 SW 2 ST, Rochester
3" waste off steamer came apart. Replace with new pipe and fittings also needs hanger
1216 SW 2 ST, Rochester
Marian Hall -Remodel 4th and 7th floors ROXX23C0310
1216 SW 2 ST, Rochester
-Marian Hall -Remodel 4th and 7th floor
1216 SW 2 ST, Rochester
Steve Rasmusson/ROMH23C0020/SMC SSSMP (B) - Marian Hall 3 & 4 Remodel/ SMC Surgical Support Space Master Plan (B) - Marian Hall 3 & 4 Remodel
1216 SW 2 ST, Rochester
Replace 4 -6" steam valves and 2 control valves
1216 SW 2 ST, Rochester
Shower drain needs replacement with linear
1216 SW 2 ST, Rochester
Mayo-Marian Hall and Old Marian Hall -Electrical work for Consolidation of Marian Hall & Old Marian Hall -Mayo Project Number ROXX23C0310 Adair Project Number 17370
1216 SW 2 ST, Rochester
Create new water room for existing lab. Install new DCW line to prefilters, twin softeners, and rpzs
1216 SW 2 ST, Rochester
Toilet is leaking in wall, install new spud and flushometer
1216 SW 2 ST, Rochester
Hydronic unit heater has leak at control valve
1216 SW 2 ST, Rochester
Dhw main line has leak
1216 SW 2 ST, Rochester
roof drain replacement on Francis and Joseph roofs
1216 SW 2 ST, Rochester
install 12 new roof drains, primary and overflow
1216 SW 2 ST, Rochester
Replace existing new storm drains in louver space between air handlers and louvers
1216 SW 2 ST, Rochester
Mechanical HVAC work for renovation of Mary Brigh 5 D/E.
1216 SW 2 ST, Rochester
Hydronic work associated with upsizing piping for cooling capacity for SMC Mary Brigh 4 Cooling Capacity Upgrades Mayo Job # 7R161126 Harris Job # 0800274
1216 SW 2 ST, Rochester
James Kelly/ 7R161126 SMC M&G 4 Cooling Capacity Upgrades/ Upsizing of chilled water piping on the West wing of the floor.
1216 SW 2 ST, Rochester
Mayo-Joseph Building-01-221 -Electrical work to widen entry door -Mayo work order number 0063462 Adair work order number W6730 -This work is T&M
1216 SW 2 ST, Rochester
Mayo-Alfred Building-02-449 -Electrical work to update source water and monitoring -Mayo Work Order Number 0038145 Adair Work Order Number W6784 -This work is T&M
1216 SW 2 ST, Rochester
7R161110 - Scott Beckel - remodeling Mary Brigh 05 units D and E to construct 16 incremental CV Surgery ICU beds, with the flexibility to accommodate PCU patients.
1216 SW 2 ST, Rochester
Mechanical work associated with installing new Terminal Units, FCU’s, Dampers, Fan & Blower Coils, and GRD’s on floors 4, 5, 6, and 7. Harris Job #0800311-N5080
1216 SW 2 ST, Rochester
Remodel of office space, locker room and break room. new lighting, lighting controls, outlets and one existing panelboard replacement. Foster job# 224039
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.