Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
Electrical work for the week ending 08/09/2014 SMH - Mary Brigh 01-502 REM, WO317481
1216 SW 2 ST, Rochester
Reroof 14,836 sq ft of Joseph roofs: 4, 4A, 6-8, 11-16, 18-20 and Francis 21 building (SMH - Joseph)
1216 SW 2 ST, Rochester
Plumbing - Att. SCR-RPH Soap dispenser/ 3M ball valve are bad, need replacing would like hot water supply removed & checks leave cold only for systems (SMH - Joseph 02-161 Custodial Room, MU Utility Maintenance, WO320288)
1216 SW 2 ST, Rochester
Plumbing - Att. SCR-RPH ball valves are bad, need replacing would like hot water supply removed & checks removed (SMH - Generose 02-280 Lounge, WO320286)
1216 SW 2 ST, Rochester
Plumbing - reroofing Joseph roofs (SMH - Joseph RF13: Roof 13, WO320387)
1216 SW 2 ST, Rochester
Plumbing - CS Utility clean up; see sheet (SMH - Mary Brigh GR-525B Cart Wash, WO320383)
1216 SW 2 ST, Rochester
Mechanical - HVAC sheet metal work associated w/ infrastructure Upgrades SMH - Domitilla 3rd & 4th floor upgrade infrastructure, # 7R131400)
1216 NE 19 AVE, Rochester
Retrofit Furnace & AC
1216 SW 2 ST, Rochester
Electrical work per plans & specifications Project# 7R131400 - 14464 SMH - Domitilla 3 / 4 Infrastructure Upgrades
1216 SW 2 ST, Rochester
Hydronic - 3 & 4 floor upgrade infrastructure (SMH - Domitilla 3 & 4 - 7R131400)
1216 SW 2 ST, Rochester
Plumbing (plumbing and piping work) - 3 & 4 floor upgrade infrastructure (SMH - Domitilla 3 & 4 - 7R131400)
1216 SW 2 ST, Rochester
Electrical work done for the week ending 08/02/2014 SMH - Domitilla 07-261 REM, WO320401
1216 SW 2 ST, Rochester
Interior demolition only 3rd level, phase 1, south wing (SMH - Domitilla 3 - 7R130990)
1216 SW 2 ST, Rochester
3 & 4 floor upgrade infrastructure (SMH - Domitilla 3 & 4 - 7R131400)
1216 SW 2 ST, Rochester
OR 101 lights & equipment cabling room 1-502 (SMH - MB 1 - 7R131050)
1216 SW 2 ST, Rochester
Exterior building envolope and structural framing package #1 East Tower Expansion (St Mary's Mary Brigh 3 - 7 levels - 7R130980)
1216 SW 2 ST, Rochester
Institutional conference room upgrades (SMH - Francis Ground - 7R121180)
1216 SW 2 ST, Rochester
Electrical work done for week ending 07/26/14 SMH - Generose GR-309 REM, WO319357-R5773
1216 SW 2 ST, Rochester
Electrical work per plans & specifications for the Institutional conference room upgrades project (SMH - Francis Ground - 7R121180)
1216 SW 2 ST, Rochester
Plumbing - MU Utility Maintenance SMH - Laundry Building 02-628 Office, WO318136
1216 SW 2 ST, Rochester
Plumbing - MU Utility Maintenance SMH - Generose 01-216 Nurses Station, WO320289
1216 SW 2 ST, Rochester
Hydronic System - IU Utility Upgrade or Replacement SMH - Domitilla 06-SL3A Elevator Lobby, WO319908
1216 SW 2 ST, Rochester
Hydronic System - MU Utility Maintenance SMH - Mary Brigh 02-530 Equipment Room Primary, WO318461
1216 SW 2 ST, Rochester
Hydronic (change out existing control valves to DDC) - Institutional conference room upgrades (SMH - Francis Ground - 7R121180)
1216 SW 2 ST, Rochester
Electrical (install temperature controls) - Metabolomics lab remodel (SMH - Alfred 5 - 7R131300)