Rochester, MN
Rochester, MN
1216 SW 2 ST, Rochester
MAYO - MB - SG:759:EQU RM PRIMARY INSTALLATION OF NEW CONDENSATE METER WO 343008 5917-208
1216 SW 2 ST, Rochester
MAYO - DOMITILLA - DO:GR:137:EQU RM INSTALL SECOND GREASE INTERCEPTOR WO 343294 5917-201
1216 SW 2 ST, Rochester
MAYO - MB PARKING RAMP - VR:SG:101:STAIRWAY REMOVE AND INSTALL NEW PUMP WO 343606 5917-200
1216 SW 2 ST, Rochester
MAYO - MB - MB:10:520:GARAGE/HANGAR INSTALLATION FOR TWO SETS STACKABLE WASHERS/DRYERS WO 343690 5917-195
1216 SW 2 ST, Rochester
MAYO - JOSEPH - JO:03:207:CONF RM PERFORM LIFE SAFETY INSPECTION/FIRESTOPPING WO 342887 5917-190
1216 SW 2 ST, Rochester
Electrical (temperature controls) - Alterations for complex interventional unit (SMH - Joseph 7 - 7R160980)
1216 SW 2 ST, Rochester
Medical ICU Expansion (SMH/Mary Brigh/6th Floor - Mayo #7R160450)
1216 SW 2 ST, Rochester
Plumbing work for the Medical ICU Expansion (SMH/Mary Brigh/6th Floor - Mayo #7R160540) Alter waste and vent and domestic water for remodeled ICU and set new fixtures.
1216 SW 2 ST, Rochester
Hydronic work for Medical ICU Expansion (SMH/Mary Brigh/6th Floor - Mayo #7R160540) Heating water to new VAV boxes
1216 SW 2 ST, Rochester
Electrical work for the Medical ICU Expansion (SMH/Mary Brigh/6th Floor - Mayo #7R160540) Nietz PO# 606242-6-910E
1216 SW 2 ST, Rochester
Mechanical work for Medical ICU Expansion (SMH/Mary Brigh/6th Floor - Mayo #7R160540)
1216 SW 2 ST, Rochester
MAYO - ALFRED - AL:07:403:CUSTODIAL RM; TWIST AND FILL LINES WO 343274 5917-202
1216 SW 2 ST, Rochester
MAYO - MB - 09-503 REM 343321; 10-520 REM 343690 WORK DONE PER PLANS AND SPECIFICATIONS FOR WEEK ENDING 06/17/2017
1216 SW 2 ST, Rochester
MAYO - MB - MB:02:530:EQU RM PRIMARY; INSTALL NEW STRAINERS, VALVES, ANC COILS ON MBS10 WO 343272 5917-203
1216 SW 2 ST, Rochester
MAYO - MARIAN HALL - MH:03:504:SLEEP QTRS; REPLACE STEAM RADIATOR WO 343359 5917-199
1216 SW 2 ST, Rochester
Hydronic work associated with the alterations for respiratory therapy (SMH - Alfred & Joseph - Ground - 7R151580)
1216 SW 2 ST, Rochester
MAYO - MB - 02-725 REM 337755 WORK DONE PER PLANS AND SPECIFICATIONS FOR WEEK ENDING 05/20/2017
1216 SW 2 ST, Rochester
Electrical work for the addition of new MRI Suite for the SMC Radiology Hybrid Procedure Room - Mary Brigh Main Level (7R151430)
1216 SW 2 ST, Rochester
Electrical work for the SMC Radiology Hybrid Procedure Room - Mary Brigh Main Level (7R151430)
1216 SW 2 ST, Rochester
Electrical Temperature Controls) - Alterations for respiratory therapy (SMH - Alfred & Joseph - Ground - 7R151580)
1216 SW 2 ST, Rochester
SMH - DOMITILLA - DO:MN:160M:COMM RM; COLD WATER HOOK UP WO 343090 5917-182
1216 SW 2 ST, Rochester
SMH - MB - MB:05:639:CUSTODIAL RM; REMOVE HOT WATER LINE WO 343122 5917-183
1216 SW 2 ST, Rochester
SMH - MB - MB:GR:714:DISHROOM; DRAIN REPAIR WO 343056 5917-180
1216 SW 2 ST, Rochester
SMH - GENEROSE - GE:GR:100:EXCERCISE RM; REPLACE NORTH DRINKING FOUNTAIN WITH BOTTLE FILLER STYLE WO 342972 5917-167
1216 SW 2 ST, Rochester
Mechanical work for the alterations for respiratory therapy (SMH - Alfred & Joseph - Ground - 7R151580)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.