ROMB25C0140 SMC Surgery Incremental OR's (CONSTRUCTION PHASE) Steve Rasmusson
1216 SW 2 ST, Rochester
ROMB25C0140-Mary Brigh -Add 2 operating rooms
1216 SW 2 ST, Rochester
ROMB25C0140-Mary Brigh -Add 2 operating rooms
1216 SW 2 ST, Rochester
The buildout of two new OR rooms to include new lighting, ISO panels, lighting controls and boom terminations. Foster job# 225044
1216 SW 2 ST, Rochester
ROMB22C0010 MB 02 Essential Substation and Distribution Upgrade/Steve Rasmusson (ALFRED BUILDING)
1216 SW 2 ST, Rochester
Mechanical work related to the installation or replacement of existing ductwork. ROMB23C0050 – SMC SSSMP (A) – Male Consultants and Resident Locker Room/Remodel consultant and resident locker rooms. Harris Job # 0800360-N5080.
1216 SW 2 ST, Rochester
ROMB22C0010/ MB 02 Essential Substation and Distribution Upgrade/ Steve Rasmusson
1216 SW 2 ST, Rochester
Mary Brigh 2nd Floor - Project #ROMB22C0010 - Pipe new fan coil
1216 SW 2 ST, Rochester
Replace the 2nd floor Mary Brigh 2400V sub-station to include new MV transformers, ATS switches and switchboards Foster Job Number 224056
1216 SW 2 ST, Rochester
Hydronic equipment repair work, replacement of leaking or nonfunctioning components of the hydronic system.
1216 SW 2 ST, Rochester
St. Mary's Joseph Building-Project #ROXX24C0070 Remodel Restroom on Joseph Main Floor
1216 NE 7 ST, Rochester
Baseboard heat in upstairs and downstairs addition.
1216 SW 2 ST, Rochester
ROMB24C0070 - Controls wiring of 2 new air handling units (Mary Brigh Building, 2nd floor - Mayo)
1216 NW 41 ST, Rochester
Water heater replacement
1216 SW 2 ST, Rochester
Steve Rasmusson/ ROMB23C0050 – SMC SSSMP (A) – Male Consultants & Resident Locker Room/ Remodel consultant & resident locker rooms. Plumbing work will require access to MB 1 ceiling, ICRA Level- high.
1216 SW 2 ST, Rochester
Steve Rasmusson/ ROMB23C0090 – SMC SSSMP (A) – Female Allied Health Locker Room/ SMC Surgical Support Space Master Plan (A) - Female Allied Health Locker Room. Plumbing work will require access to MB 1 ceiling, ICRA Level- high.
1216 SW 2 ST, Rochester
Steve Rasmusson/ ROMB23C0100 – SMC SSSMP (A) – Male Allied Health Locker Room/ SMC Surgical Support Space Master Plan (A) - Male Allied Health Locker Room. Plumbing work will require access to MB 1 ceiling, ICRA Level- high.
1216 SW 2 ST, Rochester
ROPP24C0010; St Mary's Power Plant Fire Pump Controller Replacement St. Mary's Power Plant. Alter Water Connection for Fire Pump Replacement
1216 SW 2 ST, Rochester
Removal and replacement of the price ceiling for new equipment. Mayo #RONT24C0020 VNI-MCR-NTMN 860N-R VIR Angio Rm 8 Harris Job # 0800524-N5080
1216 SE 6 ST, Rochester
Replace 2 windows on main floor, left side, in bedrooms. Not rental. Same size R.O. Same kind.
1216 SW 2 ST, Rochester
ROXX21C0220 - Underground tunnel from the North side of Francis building into 2nd street.
1216 SW 2 ST, Rochester
RONT24C0020 - CONSTRUCTION INCLUDES 780 SF OF EQUIPMENT REPLACEMENT AND EXPANSION OF EQUIPMENT ROOM FOR EQUIPMENT REQUIREMENTS. PATCHING AND MATCHING TO CURRENT INTERIOR FINISHES. NASSEFF TOWER, MAIN LEVEL
1216 SW 2 ST, Rochester
ELECTRICAL WORK FOR MAYO# RONT24C0020 - CONSTRUCTION INCLUDES 780 SF OF EQUIPMENT REPLACEMENT AND EXPANSION OF EQUIPMENT ROOM FOR EQUIPMENT REQUIREMENTS. PATCHING AND MATCHING TO CURRENT INTERIOR FINISHES. NASSEFF TOWER, MAIN LEVEL EGAN FOREMAN: RUSS SPEER 507-313-8061 EGAN JOB# 613880-910
1216 SW 2 ST, Rochester
Renovation of Procedure Room, Installation of sink.
1216 SW 2 ST, Rochester
Renovation of Procedure Room. Relocating Hydronic Lines.