121 8TH ST S, Minneapolis
SUITE 610 - REWORK DIFFUSERS
1213 18TH AVE NE, Minneapolis
Meter Move Q2-2017 Batch #21
1215 18TH AVE NE, Minneapolis
Meter Move Q2-2017 Batch #21
121 8TH ST S, Minneapolis
duct work and VAV's for new floor plan. -SUITE 1250
121 8TH ST S, Minneapolis
4 VAV's and ductwork
121 8TH ST S, Minneapolis
7000 btu suite # 215. Condensing unit will be placed in parking garage above tenant space.
121 8TH ST S, Minneapolis
REMODEL OF EXISTING OFFICE SPACE - SPECIAL INSPECTIONS ARE REQUIRED FOR ALL FLOOR AND RATED WALL PENETRATIONS IF ANY (WSS) certificate of occupancy required no special inspections required yes FOR FLOOR AND RATED WALL PARTITIONS IF ANY. const typ
121 8TH ST S, Minneapolis
rough in and install 3 sinks 3 water heaters suite #1250
121 8TH ST S, Minneapolis
12th floor restrooms
121 8TH ST S, Minneapolis
FOR 12TH FLOOR RESTROOMS - 4 LAVATORIES, 5 TOILETS, 2 URINALS
121 8TH ST S, Minneapolis
INTERIOR REMODEL OF 12TH FLOOR COMMON CORRIDOR, RESTROOMS AND ELEVATOR LOBBY AREA OF EXISTING COMMERCIAL BUILDING. AAJ#1. Construction type: 1 - A occupancy: B 2015 MSBC certificate of occupancy required: NO mechanical plans
121 8TH ST S, Minneapolis
SUITE 215 TENANT BUILD OUT - NAF NAF GRILL RESTAURANT SIGNAGE REQUIRED IDENTIFYING THE LOCATION OF NEAREST PUBLIC RESTROOM certificate of occupancy required yes mechanical plans/letter of means of compliance submitted\ special inspections required y
121 8TH ST S, Minneapolis
REMODEL OF 12TH FLOOR, 8,725 SQ.FT OFFICE SPACE. MULTI-TENANT FLOOR. (DMH#1) INSTALL PARTITION WALLS FOR SMALL OFFICES, OPEN OFFICE, CONFERENCE ROOMS AND BREAKROOM. NO CHANGE IN CORRIDOR. EXISTING ELEVATOR LOBBY. Const type: 1A Occupanc
121 8TH ST S, Minneapolis
REWORK EXISTING VAV'S - NEW 1 TON DX UNIT FOR SERVER ROOM. DUCTWORK AND DIFFUSERS
121 8TH ST S, Minneapolis
electric water heater, floor drain, breakroom sink
121 8TH ST S, Minneapolis
Duct & diffusers from 5 fan coils - kitchen hood connections.
5121 18TH AVE S, Minneapolis
stucco new chimney
121 8TH ST S, Minneapolis
future gas line for restaurant
121 8TH ST S, Minneapolis
floor 17-restrooms
121 8TH ST S, Minneapolis
17th floor remodel restrooms and drinking fountain. certificate of occupancy required no special inspections required no const type: 1A occupancy: B 2015 MSBC occupant load: NA sprinklered: yes Tenant: TBD Floor(s
121 8TH ST S #TCF TOWER, Minneapolis
INSTALL (7) NEW FIXTURES
5121 18TH AVE S, Minneapolis
TEAR DOWN AND REPLACE DAMAGED MASONRY OF EXISTING CHIMNEY OF A SINGLE FAMILY HOUSE. AAJ#2 - REBUILD EXTERIOR MASONRY OF EXISTING CHIMNEY USING SAME DIMENSION COMPLYING TO CODE REQUIREMENT. SEE PLAN FOR DETAIL SCOPE OF WORK TO BE DONE AS WELL AS P
121 8TH ST S, Minneapolis
17TH FLOOR TENANT BUILDOUT APPROX 21,325 SF FOR OFFICES NOT INCLUDING CORE AREAS. certificate of occupancy required : no special inspections required: no const type: 1-A occupancy: B 2015 MSBC occupant load: 211 sprinklered: ye
121 8TH ST S, Minneapolis
ADD A MAKE-UP AIR @ 274696, 2 EXHAUST FANS (1 @ 2,925 CFM & 1 @ 750MBH), 5 FAN COIL UNITS PER ENGINEERED PLANS