Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1214 28TH ST E, Minneapolis
FOR UPPER DWELLING OF DUPLEX - 21 REPLACEMENT WINDOWS WITH EXISTING OPENINGS
121 8TH ST S, Minneapolis
(DMH#1) REMODEL TO SUITE 940, 5,072 S.F. SELECT DEMO AND INSTALL NEW PARTITIONS WALLS FOR NEW CONFERENCE ROOM AND CLOSET. REMODEL OPEN EMPLOYEE BREAKROOM. REPLACE SELECT DOORS. INSTALL NEW CARD READER AT SUITE ENTRY. NEW CARPET AND A.C.T. NO CH
121 8TH ST S, Minneapolis
2ND FLOOR NEW FAN COIL UNITS, DUCTS , DIFFUSERS,& CHILLED WATER PER PLANS
121 8TH ST S, Minneapolis
REWORK DIFFUSERS FOR SUITE #1140
121 8TH ST S, Minneapolis
OFFICE BUILD-OUT TO SMALL 16' X 27' OFFICE SPACE. NO CHANGE IN USE, EXIT OR CORRIDOR. (DMH#2) APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDIT
1213 38TH ST E, Minneapolis
Replacing Furnace
121 8TH ST S, Minneapolis
Tenant office remodel approx. 50 s.f. no change in layout or occupancy
121 8TH ST S, Minneapolis
Parking garage repair ENGINEER: Palanisami - Michael Deiss #26604
121 8TH ST S, Minneapolis
TENANT BUILDOUT OF EXISTING SHELL SPACE certificate of occupancy required: YES mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required: YES - FIRE RATED PENETRATI
121 8TH ST S, Minneapolis
FOR 10TH FLOOR "SPEC SUITES" - 2 ELECTRIC WATER HEATERS, 2 KITCHEN SINKS, AND 2 FLOOR DRAINS TOTAL
121 8TH ST S, Minneapolis
RENOVATION OF PARTIAL FLOOR ON 8TH FLOOR TENANT SUITE 893 (MAA#02) const type: 1-A occupancy: B 2015 MSBC occupant load: 8 sprinklered: YES Tenant: LUNDGREN & JOHNSON Floor(s): architect:COLE D. BAESSLER # 55643 e
121 8TH ST S, Minneapolis
INTERIOR REMODEL OF PARTIAL 8TH FLOOR AT SUITE 895 (MAA #02) certificate of occupancy required: YES const type: B occupancy: IA 2015 MSBC occupant load: 20 sprinklered: YES Tenant: BARACK, FERRAZZANO, KIRSCHBAUM, NAGELBERG
121 8TH ST S, Minneapolis
INTERIOR REMODEL OF 10TH FLOOR. 2 SEPARATE SPACES. ONLY DEMO IS AT CORRIDOR WALL. ADDING DOORS TO SPACES. (JJL) certificate of occupancy required: no special inspections required: yes no const type: IA occupancy: B
121 8TH ST S, Minneapolis
OFFICE BUILDOUT & REMOD FLOORS 14, 15, 16 certificate of occupancy required: no special inspections required: Yes const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: Schwegman, Lundberg, & Woessner Floor(s)
121 8TH ST S, Minneapolis
1ST FLOOR/GREY FOX - DUCTWORK AND DIFFUSERS
5121 18TH AVE S, Minneapolis
REPLACE 6 WINDOWS AND 1 ENTRY DOOR WITHIN EXISTING OPENINGS.
121 8TH ST S, Minneapolis
14th floor common corridor restrooms. Fixture change outs for 6 lavs, 3 urinals, 5 toilets, and 1 hi-low drinking fountain.
121 8TH ST S, Minneapolis
REWORK DUCTS & DIFFUSERS FOR 14TH, 15TH, 16TH FLOORS
121 8TH ST S, Minneapolis
floor 14 and 15 14th sink 15th breakroom sink
121 8TH ST S, Minneapolis
replace dishwasher suite # 1111
121 8TH ST S, Minneapolis
INSTALL NEW DIFFUSERS FOR THE 14TH FLOOR
121 8TH ST S #STE 242, Minneapolis
Hot Indian Foods
121 8TH ST S #STE 242, Minneapolis
INTERIOR REMODEL TO 1,294 S.F SKYWAY LEVEL EATING ESTABLISHMENT FOR NEW TENANT. (DMH#2) INSTALL NEW HALF HEIGHT AND FULL HEIGHT PARTITION WALLS, KITCHEN REMODEL AND STORE FINISHES. NO CHANGE IN EXITS OR USE. SEATING FOR 14 SHOWN. Const type:
121 8TH ST S #STE 242, Minneapolis
(1) 2 TON FCU (1) 4 TON FCU FOR HEATING AND (1) 2 TON A/C Both Chilled water & steam heating coils, exhaust fan and associated ductwork per Engineered drawings
121 8TH ST S, Minneapolis
Adding smoke doors, and making bathrooms accessible on the 14th Floor. certificate of occupancy required no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.