121 8TH ST S, Minneapolis
INTERIOR REMODEL AT SUITE # 995 certificate of occupancy required: NO ***** const type: B ***occupancy: IA ***2015 MSBC***** occupant load: 32 sprinklered: YES Tenant: SYNERFUSE ***Floor(s): 9TH architect: MARY B.
121 8TH ST S, Minneapolis
SUITE 995 BREAKROOM - ROUGH-IN AND INSTALL SINK, DISHWASHER, WATER HEATER & STANDPIPE
121 8TH ST S, Minneapolis
INTERIOR REMODEL OF EXISTING OFFICE SPACE OF A COMMERCIAL BUILDING. AAJ#1 certificate of occupancy required yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections r
121 8TH ST S, Minneapolis
Relocate VAV ______ INSPECTION REQUIRED. CONTACT INSPECTOR TO SCHEDULE INSPECTION.
3121 38TH AVE S, Minneapolis
Re roof tear off asphalt
121 8TH ST S, Minneapolis
REWORK EXISTING HVAC FOR 13TH FLOOR CORRIDOR
121 8TH ST S, Minneapolis
REWORK DUCTS / 2 NEW VAV'S / GRD'S FOR SUITE #1300
1215 18TH AVE NE, Minneapolis
REPLACE WATER HEATER
121 8TH ST S, Minneapolis
(DMH#1) BUILD-OUT TO 4,400 SQ.FT TENANT OFFICE SPACE. INSTALL PARTITION WALLS FOR SMALL OFFICES, CONFERENCE ROOM AND EMPLOYEE KITCHEN. NO CHANGE IN CORRIDOR. Const type: I-A Occupancy: B 2015 MSBC Occupant Load: 44 (Archit calc.)
121 8TH ST S, Minneapolis
121 8TH ST S, Minneapolis
121 8TH ST S, Minneapolis
CREATE CORRIDOR FOR FUTURE TENANTS AND RESTROOM REMODEL AT 13TH FLOOR (MAA) const type: IA ***occupancy: B ***2015 MSBC***** Tenant: RYAN COMPANIES ***Floor(s): 13TH architect: MARY B. HUSTAD 17408
121 8TH ST S #RAMP, Minneapolis
Parking Ramp Repairs certificate of occupancy required: no************* special inspections required: yes ************ occupancy: S2 2015 MSBC*********** engineer: Jeremy Dahmen #54282 *************
5121 18TH AVE S, Minneapolis
INSTALL GAS FIREPLACE AND GAS LINE
121 8TH ST S, Minneapolis
REMOVE AND RE-INSTALL DIFFUSERS FOR NEW CEILING IN ELEVATOR LOBBY
121 8TH ST S, Minneapolis
REPLACE BATH FIXTURES AND BREAK ROOM SINK
121 8TH ST S, Minneapolis
CORRIDOR REMODEL AND BATHROOM REMODEL ON 11TH FLOOR. NON COMBUSTIBLE CONSTRUCTION. (JJL)******** rtificate of occupancy required: no************** mechanical plans required for certificate of occupancy* - NOT SUBMITTED************ mechanical plans/l
5121 18TH AVE S, Minneapolis
REPLACE EXISTING BASEEMENT WINDOW IN EXISTING OPENING. INSTALL NEW BASEMENT EGRESS WINDOW PER DEPARTMENT BULLETIN. (sza) THIS PERMIT FOR AN EGRESS WINDOW IN NO WAY ALLOWS CREATION OF AN ADDITIONAL DWELLING UNIT NOR DOES IT MAKE A BASMENT BEDROOM LEGAL T
121 8TH ST S, Minneapolis
Non-structural remodel Office Space- Suite 1100. Type I-A fully sprinkled. No chg to occupant load or exiting. No change to core. Permit fully accessible
121 8TH ST S, Minneapolis
9TH FLOOR RESTROOM/CORRIDOR REMODEL. ***new electric water cooler plumbing rough-in must not penetrate exit stair enclosure*** Re-construct north elevator lobby to original smoke partition requirements (minimum). Accessibility of existing toilet room en
121 8TH ST S, Minneapolis
Non-structural interior remodel of existing space - 10th FL. No impact on floor or wall rated assemblies.
121 8TH ST S, Minneapolis
FIXTURES FOR 9TH FLOOR RESTROOM
1214 8TH ST SE, Minneapolis
REPLACE WATER HEATER
121 8TH ST S, Minneapolis
REWORK EXISTING HVAC / ADD 1 NEW VAV & 1 FAN
121 8TH ST S, Minneapolis
SUITE # 490 ROUGH IN FINISH BREAKROOM SINK LAUNDRY WASHER BOX RELOCATE WATER HEATER IN CEILING