Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1121 48TH ST W, Minneapolis
INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _6.44___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as applicable. ADDITIONAL PERMITS: PV SYSTEMS ALSO REQ
5121 18TH AVE S, Minneapolis
WATER HEATER REPLACEMENT
121 8TH ST S, Minneapolis
FOR #215/SPICE SHACK - INSTALL CLIENT SUPPLIED COOKING FIXTURES ONTO EXISTING GAS STUB OUTS.
1214 28TH ST E, Minneapolis
Tear off and replace roof on house
121 8TH ST S #RAMP, Minneapolis
REPAIR PARKING GARAGE CONCRETE - LEVEL 3 2020 MSBC engineer: Deiss, Michael Lee - 26604
1121 48TH ST W, Minneapolis
Replace 2.5 ton AC & fan coil
3121 38TH AVE S, Minneapolis
replace a/c ml14xci 2 ton
121 8TH ST S, Minneapolis
TENANT REMODEL. INFILL FLOOR AFTER REMOVING COMUNICATING STAIRS AND LIFT. 14TH AND 15TH FLOORS. FIRE PROTECTION REQUIRED. (JJL) certificate of occupancy required: no ***** special inspections required: yes *********** const type: IA
3121 38TH AVE S, Minneapolis
METER MOVE Q4 - 2022 BATCH #10
1215 18TH AVE NE, Minneapolis
REPLACE AC
3121 38TH ST E, Minneapolis
METER MOVE Q2 - 2022 BATCH #11
3121 38TH AVE S, Minneapolis
Furnace Replacement
1213 38TH ST E, Minneapolis
Reroof of house and replacing of flashing
121 8TH ST S, Minneapolis
Demo & Cap Plumbing
121 8TH ST S #RAMP, Minneapolis
parking ramp repairs on level 3. engineer: palanisami
121 8TH ST S, Minneapolis
PROVIDE, ROUGH-IN AND INSTALL RESTROOM FIXTURES FOR 6TH FLOOR COMMON AREA
1210 28TH ST W, Minneapolis
METER MOVE Q3 - 2021 BATCH #44
121 8TH ST S, Minneapolis
(DMH - ProjectDox) DEMO AND REMODEL TO 6TH FLOOR BUILDING CORE MENS & WOMENS RESTROOMS. REPLACE ALL FIXTURES WITH NEW IN SAME LOCATIONS. DEMO AND RECONSTRUCT ELEVATOR LOBBY SMOKE PARTITION WALLS AND DOORS. NO CHANGE IN EXITING. Const type: 1-A
1211 28TH ST E, Minneapolis
roof tear off and re-roof house and garage, Architectural Asphalt shingles.
121 8TH ST S, Minneapolis
Allina Clinic Security Upgrades - TCF Tower Women's Health - Suite 600 Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. certificate of occupancy required: no special inspec
121 8TH ST S, Minneapolis
HVAC system alteration adding one VAV box and rework existing ductwork per attached plan.
121 8TH ST S, Minneapolis
ROUGH-IN AND INSTALL (1) SINK, (1) ELECTRIC WATER HEATER, AND (1) WATER SUPPLY FOR COFFEE MAKER - SUITE 890
1217 28TH AVE NE, Minneapolis
METER MOVE Q2 - 2021 BATCH #7
1215 28TH AVE NE, Minneapolis
METER MOVE Q2 - 2021 BATCH #7
121 8TH ST S, Minneapolis
INTERIOR REMODEL SUITE 890 certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: 24 in suite 890 sprinklered: yes Tenant: CSC Gold Floor(s): 8th sac: _ NA architect: Hust
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.