Saint Paul, MN
Saint Paul, MN
11
3
$33,000
HPC. Drain Tile.
Move (5) supplies Move (1) return Vent (1)bath fan Vent (1) microwave
Electrical remodel project. Main floor and basement wiring. Floor heat wiring in basement bathroom.
Hook up kitchen sink and disopsal.
Remodeling plans, removing wall off kitchen, adding beam where wall was, removing railing off stairs replacing with pony wall.
Remodel bathroom shower area/ flooring and walls in those locations; bedroom: repair 2 walls in bedroom that had some water damage (remove sheetrock 3’ up walls, repair area and replace sheetrock)
Basment Bathroom remodel
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.