Rochester, MN
Rochester, MN
118
3
$1,650
Replace existing central air conditioning system
Full window replacement throughout the entire building excluding the 2014 Kindergarten Addition. (Lincoln school)
Fire alarm upgrades. (Lincoln Elementary School)
Plumbing - supply and install new primary roof drain piping per plan. Existing gym roof drain was abandoned under South parking lot. This project will reroute the roof drain piping and tie into the existing storm sewer. (Lincoln Elementary)
Existing gym roof drain was abandoned under South parking lot. This project will reroute the roof drain piping and tie into the existing storm sewer. (Lincoln Elementary)
Plumbing - install Watts LF009 3/4" RPZ backflow preventer in basement utility room with air gaped drainage to 4" floor drain; to 1" AquaPEX through sill plate and sheathed in HDPE 6-12" below grade under deck to irrigation valve well for drip system & seasonal bibb. Replace water heater softener with AO Smith 40K Grain
Windows, egress, bathroom | Other
ELECTRICAL - Radon Hook Up
HVAC - A/C & ZONING
Electrical - wire a/c replacement
Grading work for pavement and drainage improvements for Lincoln Elementary
Gas Piping (convert low pressure as system to 2# gas) Kitchen and laundry remodel. Owner to remove and replace drywall. (Structural work to be done & permitted by professional contractors) replacing bearing wall with new beam main level. (Revised MAT 7/10/18)
Replacing bearing wall with structural beam on main level. See permit #18-0440RB
Plumbing (kitchen/laundry.water heater replacement) - Kitchen and laundry remodel. Owner to remove and replace drywall. (Structural work to be done & permitted by professional contractors) replacing bearing wall with new beam main level. (Revised MAT 7/10/18)
Electrical - wire a/c
Mechanical - new AC
Electrical (kitchen remodel, main panel replacement, garage utility receptacle, kitchen lighting, appliance & conv. receptacles) - Owner to remove and replace drywall. (Structural work to be done & permitted by professional contractors)
Mechanical (replacement of kitchen fan with vent hood) - Owner to remove and replace drywall. (Structural work to be done & permitted by professional contractors)
Kitchen and laundry remodel. Owner to remove and replace drywall. (Structural work to be done & permitted by professional contractors) replacing bearing wall with new beam main level. (Revised MAT 7/10/18)
Gas piping work for the alterations to HVAC system upgrade & re-roof (Rochester Public Schools - Lincoln at Mann Elementary School) Hook up gas piping to new water heater and 2 new boilers.
Provide and install new high efficiency boilers, new chiller and associated hydronic piping. Alterations to HVAC system upgrade & re-roof (Rochester Public Schools - Lincoln at Mann Elementary School)
Provide and install new water heater, new domestic water piping, new fixtures, new roof drains, and plumbing for bath remodels. Alterations to HVAC system upgrade & re-roof (Rochester Public Schools - Lincoln at Mann Elementary School)
Alterations to HVAC system upgrade & re-roof (Rochester Public Schools - Lincoln at Mann Elementary School)
Electrical (IAQ and ADA upgrades) Alterations to HVAC system upgrade & re-roof (Rochester Public Schools - Lincoln at Mann Elementary School)
Mechanical (HVAC) - Alterations to HVAC system upgrade & re-roof (Rochester Public Schools - Lincoln at Mann Elementary School)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.