UNIT 37A--INSTALLATION OF (2) FACTORY BUILT GAS FIREPLACES. ORTAL CLEAR 150H AND DAVINCI CUSTOM (LIVING ROOM)
install gas fireplace #36B - gas line by others
SET, VENT INSTALLATION OF A T%C 30 GAS FIREPLACE AND VENTING INTO THE LIVING ROOM. CONNECTING TO EXISTING VENTING RUN PREVIOUSLY BY OTHERS. GAS AND ELECTRIC BY OTHERS-BEING HOOKED UP BY OTHERS TO THE FIREPLACE
PLUMBING TENANT FINISH 37TH FLOOR
INTERIOR BUILD OUT OF UNIT 36 B (MAA)
(DMH - ProjectDox) INTERIOR BUILD-OUT/ FINISH TO CONDO UNIT #37 A AND ISSUANCE OF C. of O. Const type: 1A Occupancy: R-2 2020 MSBC Certificate of Occupancy required: YES. See attached bulletin "Certificate of Occupancy Policy" in Revie
Gas fireplace installation, not adding gas line.
install gas fireplace. not doing the gas line
FINISH - UNIT 17B ----- occupancy: R2 construction type: I-B ----- windows with sill heights less than 36 inches above the floor shall be equipped with fall prevention devices that limit the window opening to less than 4 inches in accordance with 2
INSTALL GAS LINE FOR FIRE PLACE IN UNIT 24d
MINOR DEMO TO REMOVE CLOSET FROM 2ND BEDROOM, PATCH WALLS AS NEEDED, RELOCATE SPRINKLER HEAD - UNIT #31A, ELEVEN. const type: 1-A occupancy: R-2 (31ST FLOOR) 2020 MSBC sprinklered: YES Tenant: UNIT 31A Floor(s): 31
Install Gas Fireplace - Unit 24D WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDING, AND WALLS SEPARATING DWELLING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS FIRE PARTITIONS IN ACCORDANCE WITH BUILDING
unit 24D factory built gas fireplace w/power vent
Unit 30C Interior Finish CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIFICATE OF OCCUPANCY INSPECTION TWENTY (20) BUSINESS DAYS BEFORE THE DATE OF DESIRED OCCUPANCY. WAL
FINISH UNIT 31C - architect: JAMES E McNEAL - 22269 ----- ----- Issuance of this permit doesn't allow a violation of Building Code or any other laws or ordinances. ----- WORK COMPLETED OR OMITTED IN VIOLATION OF BUILDING CODE MUST BE CORRECTED AS
(DMH - ProjectDox) INTERIOR BUILD-OUT/ FINISH TO CONDO UNIT #28 B AND ISSUANCE OF C. of O. Const type: 1A Occupancy: R-2 2020 MSBC Certificate of Occupancy required: YES. See attached bulletin "Certificate of Occupancy Policy" in Revie
interior shell construction of unit 33C - additional permit to follow for specific interior buildout.
interior shell construction of unit 33B - additional permit to follow for specific interior buildout.
interior shell construction of unit 33A - additional permit to follow for specific interior buildout.
interior shell construction of unit 32C - additional permit to follow for specific interior buildout.
interior shell construction of unit 32B - additional permit to follow for specific interior buildout.
interior shell construction of unit 32A - additional permit to follow for specific interior buildout.
additional work on 32nd and 33rd floors to add a 3rd dwelling unit per floor. sck certificate of occupancy required yes const type: 1a occupancy: R2 2015 MSBC sprinklered: yes Floor(s): 32 and 33 sac: _2_charges met council l
Plumbing buildout of Unit 3D at Eleven on the River see master plumbing permit BLDG808592