Minneapolis, MN
Minneapolis, MN
402
13
$176,044,383
Replace Gas Dryer Unit 17A
HVAC installation on floors 37 & 38 for existing shell building, using existing outside air and exhaust system, installing fin-tube radiation, fan-coil units, chilled & hot water piping connections, exhaust fans, GRDs, and all associated ductwork per the
floors 37 & 38 shell construction will get plumbing units and build out All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices
Single unit build out on 38th Floor, unit B -ACW certificate of occupancy required: yes mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted special inspections required: no cons
Single unit build out on 37th Floor, Unit B -ACW certificate of occupancy required: yes mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted special inspections required: no const t
New pergola at roof deck of existing high rise -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC engineer: Robinson, Charles Michael windows with sill heights less than 36 inches above the floor
Extending heating and chilled water piping, from existing takeoffs, to provide future connection points to 6 future 7th floor auxiliary units. Condensate piping is not part of work scope. BLDG1132637
Install (2) new commercial water softeners Each dual resin tanks and 40 gal salt tank Connect to existing piping.
T/I 5 "AUXILIARY UNITS" ON LEVEL 7 2020 MSBC architect: 62043 - Bunke, Brett Alan @ RYAN
Gas dryer and dishwasher #9D
HVAC Installation for (3) condo unit build outs on LV34 (units 34A, 34B, 34C). Modify existing hot water fin tube radiation. Install ductwork to (7) existing hydronic heating and cooling fan coil units. Connect makeup air and exhaust ductwork to existing
BLDG1112803 Modify finned tube radiation to accommodate new floor plan. Adding 2 new HFCU's with piping ductwork and diffusers.
Install water, waste and vent pipe to new fixtures for Suite A, 35th floor.
Scope includes modifying existing domestic water piping, sanitary waste and vent piping, and natural gas piping for tenant improvements in 34th floor units: 34A, 34B and 34C. Install new plumbing fixtures. All plumbing shall be installed in accordan
(DMH-ProjectDox) INTERIOR BUILDOUT OF UNIT 34B Const type: 1-A Occupancy: R-2 2020 MSBC Certificate of Occupancy required: YES. See attached bulletin "Certificate of Occupancy Policy" in Reviewer Attachments Folder. Sprinkled: YES SAC: C
(DMH-ProjectDox) INTERIOR BUILDOUT OF UNIT 34C Const type: 1-A Occupancy: R-2 2020 MSBC Certificate of Occupancy required: YES. See attached bulletin "Certificate of Occupancy Policy" in Reviewer Attachments Folder. Sprinkled: YES SAC: C
(DMH-ProjectDox) INTERIOR BUILDOUT OF UNIT 34A Const type: 1-A Occupancy: R-2 2020 MSBC Certificate of Occupancy required: YES. See attached bulletin "Certificate of Occupancy Policy" in Reviewer Attachments Folder. Sprinkled: YES SAC: C
FOR UNITS 35B & 35C - PLUMBING BUILDOUT Install water, waste and vent pipe to new fixtures for Suite B and C buildout. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe
#30C - BATHROOM FIXTURES: Remove lavatory for new countertops, reinstall 2 lavatories
HVAC system for two condominiums, Installing vertical chilled water fan-coils, fin-tube radiation, exhaust fans, GRDs and all associated ductwork per approved plans.
UNIT 35A BUILDOUT. NO STRUCTURAL WORK. NO CHANGE OF EXITING. (JJL) TYPE I CONSTRUCTION R2 OCCUPANCY ARCHITECT: RYAN - BRETT BUNKE #62043
Install gas fireplace Unit 35A
Install gas fireplace Unit 35B
interior buildout of unit 35B. certificate of occupancy required: yes - first buildout of shell unit const type: 1a occupancy: r2 2020 MSBC sprinklered: yes sac: SAC collected on permit BLDG1089859 met council letter dated _1
interior buildout of unit 35C. certificate of occupancy required: yes - first buildout of shell unit const type: 1a occupancy: r2 2020 MSBC sprinklered: yes sac: _1_charges _ met council letter dated _10/29/24_ architect
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.