Saint Paul, MN
Saint Paul, MN
38
1
DRAIN TILE AND SUMP PUMP
HPC - UNIT B- BASEMENT SHOWER REPLACEMENT
HPC - UNIT B REPLACE 4 WINDOWS WITHIN EXISTING OPENINGS
HPC - UNIT B REPLACE GLASS SOLARIUM ROOF WITH NEW SHINGLED ROOF 08/08/22 PLANS MAILED. DV
HPC - UNIT B - REPLACE 11 WINDOWS WITHIN EXISTING OPENINGS
UNIT 1 KITCHEN RENOVATION AND (2) 2ND FLOOR BATHROOM RENOVATIONS. REPLACE (3) WINDOWS ON 1ST FLOOR
APT A REPLACE 13 WINDOWS & 1 PATIO DOOR WITHIN EXISTING OPENINGS
INSTALL SINGLE FRENCH DOOR IN TWO WINDOW OPENINGS ON EAST SIDE OF CARRIAGE HOUSE. THE DOORS WILL BE INSTALLED WITHIN THE EXISTING OPENINGS USING THE EXISTING STEEL LENTILS BURIED IN THE BRICK AND WILL NOT BE DISTURBED. THE SIDES WILL NOT BE MADE WIDER. THE LENTIL/HEADERS HAVE BEEN THERE OVER 130 YEARS AND HAS NO VISUAL CRACKS.
HPC- UNIT A - REPLACE 1 ENTRY DOOR WITH IN EXISTING OPENING
UNIT C - REPLACE ENTRY DOOR W/IN EXISTING OPENING
INTERIOR REMODEL: BATH, LAUNDRY, MASTER BEDROOM & STUDY. The following "Trade" Permits are required for this project: Electrical, W.Air Vent, Plumbing,
UNIT C - BATH REMODEL.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.