Saint Paul, MN
Saint Paul, MN
38
1
1
Remove and replace full flat EPDM roof on 442 Summit Ave property.
CIRCUITRY FOR BOILER REPLACEMENT
Full roof replacement. Tear off existing membrane and insulatin. Replace with 4-6" of ISO taper insulation. R-Value=30 Install EPDM membrane
TISH
We are requesting no parking signs on one side of the road on 280 Summit Avenue, to safely remove a tree. See red line on map attached for more details.
Installation of stainless steel flex liner into masonry wood fireplace/chimney
TISH
Replace 9 windows within existing openings. HPC Approved
hand dig in EB summit ave greenspace BT Victoria and Avon. 5 ft hand dug for anode. 40 ft obstruction in EB parking lane.
TISH
HPC - UNIT 1 - DEMO EXISTING. INSTALL NEW SHOWER SYSTEM AND WALL SURROUND. MN RUSCO TO INSULATE, INSTALL VAPOR BARRIER, TAPE AND SEAL. INSTALL SMOKE & C.O. ALARMS TO CODE. PLBG PERMIT TO BE PULLED SEPARATELY.
HPC. REPLACE 8 WINDOWS WITHIN EXISTING OPENINGS
SHINGLE ROOF REPLACEMENT ON 4 UNIT TOWNHOUSES
378 W IRVINE AVE - SHINGLE ROOF REPLACEMENT ON 3 UNIT TOWNHOUSES
HPC - REPLACE 18 WINDOWS WITHIN EXISTING OPENINGS
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.